Consultancy Services for Transaction Support for Mobilization of Private Capital for energy efficiency
Airports of Mauritius Ltd · International
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- MU-AML-532999-CS-INDV
- Organisme émetteur
- Airports of Mauritius Ltd · Voir l'historique des attributions →
- Palier de gouvernement
- international
- Type d’appel d’offres
- Professional & Consulting Services
- Titre
- Consultancy Services for Transaction Support for Mobilization of Private Capital for energy efficiency
- Source
- World Bank
- Identifiant de la source
- OP00451736
Détails
- Lieu
- International
Résumé
REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services – Individual Selection Country: Republic of Mauritius Name of Project: Rodrigues Airport Project, New Runway and Associated Facilities Project (P180266) Loan No.: IBRD-95910 Assignment Title: Transaction Support for Mobilization of Private Capital to Improve Energy Security in Desalination Plants through the Installation of a 1MW Solar Power Plant Reference No: MU-AML-532999-CS-INDV BACKGROUND The Ministry of Finance has received financing from the World Bank and a grant from the European Union toward the cost of the Construction of a New Runway and Other facilities for Plaine Corail Airport, Rodrigues, and intends to apply part of the proceeds towards recruitment of Transaction Support Consultancy Services for Mobilization of Private Capital to Improve Energy Security in Desalination Plants Through the Installation of a 1MW Solar Power Plant. OBJECTIVE OF THE ASSIGNMENT The objective of the assignment is to support the Rodrigues Regional Assembly (RRA) in the mobilization of private capital to improve energy security in desalination plants through the installation of a 1 MW solar power plant. BRIEF SCOPE OF THE ASSIGNMENT To review past assessment reports on the electric power supply situation in Rodrigues, Highlighting gaps, challenges, bottlenecks and opportunities for renewable energy power supply on the island. Assessing the institutional, policy and regulatory frameworks governing the generation, distribution and supply of electricity in Rodrigues, with a focus on existing energy generation schemes under the Central Electricity Board (CEB).Undertaking a feasibility study for the proposed 1 MW solar power plant at the Pointe Cotton desalination plant, outlining the technical, financial, economic, environmental and institutional feasibility options, highlighting the investment framework and the implementation roadmap. To develop a bankable strategic business plan based on the preferred investment option for the 1 MW solar power plant, outlining how the project will be financed, implemented, operated, and sustainably managed as a viable investment. To develop guidelines for energy efficiency in the operation of desalination plants by the RPUC/RRA.To support the RRA in mobilizing private capital and/or accessing commercial financing for the development of the proposed 1 MW solar power plant, and explore the opportunities to verify and sell carbon credits. Preparing a final report outlining the project’s progress, the key outcomes, the challenges, the lessons learned and recommendations for future improvement.DURATION OF THE ASSIGNMENT The duration of the assignment is 10 calendar months from the date of contract signature. TERMS OF REFERENCE The detailed Terms of Reference (TOR) for the assignment can be obtained from the websites of Airports of Mauritius Co. Ltd and Airports of Rodrigues Ltd at the following links: https://aml.mru.aero/index.php/business/rap and Airport of Rodrigues Ltd. INVITATION TO EXPRESS INTEREST The Airports of Mauritius Co. Ltd now invites eligible consultants (“Consultants”) to express their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting Criteria are outlined below. QUALIFICATIONS AND EXPERIENCE The consultant may either be a national or an international expert with adequate skills and experience to oversee the successful implementation of the assignment. The individual consultant should have the following minimum qualifications: Master’s degree in Renewable Energy, Electrical Engineering, Energy and Environmental Engineering, Water and Environmental Engineering, or any other related field. Renewable energy practitioner with at least 20 years of relevant professional experience in feasibility studies, design and implementation of renewable energy projects, with demonstrated experience in financial and economic analysis and development of business plans for proposed renewable energy projects. Demonstrated experience in the design, sizing, engineering, and performance assessment of solar photovoltaic systems of at least 1–5 MW capacity. Familiarity with international standards applicable to solar systems (e.g., IEC 61215, IEC 61730, IEC 62446, IEC 62116). Proven experience integrating renewable energy systems, particularly solar PV, with desalination facilities (especially Reverse Osmosis water treatment systems). Strong understanding of energy efficiency requirements and operational impacts on high-pressure pump systems. Demonstrated expertise in financial modelling for renewable energy projects, including NPV, IRR, BCR, WACC, and LCOE calculations. Experience developing and applying monitoring systems for renewable energy projects. Experience in tariff modelling, procurement processes, and IPP transactions. Experience in structuring PPP
Description
REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services – Individual Selection Country: Republic of Mauritius Name of Project: Rodrigues Airport Project, New Runway and Associated Facilities Project (P180266) Loan No.: IBRD-95910 Assignment Title: Transaction Support for Mobilization of Private Capital to Improve Energy Security in Desalination Plants through the Installation of a 1MW Solar Power Plant Reference No: MU-AML-532999-CS-INDV BACKGROUND The Ministry of Finance has received fin...
Dates
- Publication
- 16 juin 2026 à 20 h 00
- Date de clôture
- 5 juillet 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: World Bank
Dernière modification : 2026-09-09 20 h 56 min 48 s