Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEME
Federal Highway Administration · États-Unis
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 693C7319C000005
- Organisme émetteur
- Federal Highway Administration · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEME
- Source
- USASpending (Federal)
- Identifiant de la source
- usa-693C7319C000005
Détails
- Lieu
- États-Unis
Résumé
PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT OVERLAY, AN ULTRA-THIN BONDED WEARING COURSE, SHOULDER AND DITCH RECONDITIONING, PERMANENT PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK. Awarded to: GC WORKS INC Agency: Department of Transportation Sub-agency: Federal Highway Administration Award type: DEFINITIVE CONTRACT
Description
PROJECT NP-GRSM 13(1), 14(2), 18(1) THE PROJECT CONSISTS OF THE RESURFACING OF APPROXIMATELY 5.33 MILES OF FIGHTING CREEK GAP ROAD FROM MILEPOST 0.00 TO 4.97, APPROXIMATELY 12.58 MILES OF LITTLE RIVER GORGE ROAD FROM MILEPOST 0.00 TO 12.58, APPROXIMATELY 1.53 MILES OF ELKMONT ROAD FROM MILEPOST 0.00 TO 1.53, INCLUDING PARKING AREAS AND PULL-OFFS, AND REHABILITATION OF SUGARLANDS VISITOR CENTER AREA. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMEN...
Dates
- Publication
- 17 décembre 2018 à 19 h 00
- Date de clôture
- 22 décembre 2025 à 19 h 00
Valeur estimée
$6.5M USD
Classification
Catégorie normalisée
Source: USASpending (Federal)
Dernière modification : 2026-05-25 14 h 34 min 09 s
Actualisation toutes les 2 heures