Pan Am Pool Main Tank Renewal

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 1 juin 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000321583
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Pan Am Pool Main Tank Renewal
Identifiant de la source
0000321583

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description B6. SCOPE OF WORK B6.1 The Work to be done under the subsequent Contract shall consist of rehabilitation of the main tank, diving platforms, and deck area of the main tank at the Pan Am Pool. B6.2 The Pan Am Pool area will be closed to the general public for the duration of the project. (a) The East training tank, locker rooms, East concourse dryland training area and concourse level spaces to provide access to these areas will remain open to select user groups during construction. The Contractor shall provide adequate separation protection of the construction areas to allow this occupancy. B6.3 The Pan Am Pool is the City of Winnipeg’s premier aquatic facility where specialized aquatics activities and events are performed and hosted. The work shall be completed to the tolerances of international aquatics standards. B6.4 The major components of the Work are as follows: (a) General Requirements: (i) General coordination, management, supervision and administration as typically assigned responsibilities of a general Contractor of the project as a general Contractor either self performing and/or retaining subcontractors for the work outlined below. (ii) Contractors self-performing and subcontractors retained to complete work outlined below shall meet qualification requirements specified in the Tender for the project. Prior to award of the Tender, the successful Bidder shall provide evidence that contractors self performing, and subcontractors assigned to the work meet the qualification requirements specified in the Tender. Contractors self-performing and subcontractors found not to meet the qualifications specified in the Tender shall be rejected and the Contractor shall replace unqualified trades with qualified subcontractors at no increase in Contract Price or Contract Time. (iii) Prime Contractor as defined by workplace safety and health legislation. (iv) Segregation of construction areas from publicly occupied areas of the facility. (v) Hazardous materials abatement: The Tender for the project will include technical specifications for the abatement of hazardous materials. In addition to coordination with the Contract Administrator, the successful contractor of the Tender shall coordinate abatement work with the abatement consultant. Site reviews and air monitoring by the abatement consultant will be handled directly with the City of Winnipeg and will not form part of the Tender contract. The abatement consultant will have the authority to provide direction directly to the Contractor. The abatement consultant for this project is Pinchin. (vi) Traffic control: The Contractor shall be responsible to develop, implement and maintain a traffic control program, acceptable to the City to allow the partial public use of the facility during construction. The partial public occupancy will be assigned and designated access location to the facility controlled by the City of Winnipeg. The Contractor will not be required to provide control for this access. The Contractor will be provided with an exterior compound located at the S.W. main facility entrance and designated contractor parking. (b) Architectural: (i) Demolition of existing mortar bed, ceramic tiles tiling setting mortar and grout to expose underlaying structural concrete of the main pool tank floor and walls and deck floor of the main tank area. (ii) Demolition of existing mortar bed, ceramic tiles tiling setting mortar and grout to expose underlaying structural concrete of the four diving platforms in the main tank area. (iii) Removal, salvage, storing and re-installation of starting platforms, diving bubbler system, and tank entry stairs. The City will be responsible for the removal and re- installation of deck fittings such as ladders, accessible chair lifts, and lifeguard chairs. (iv) Removal, salvage, storing and re-installation, or protection and shoring in place of the existing main tank divider bulkheads. (v) Removal, salvage, refurbishing, and re-installation of springboard diving boards and components by trades meeting specified qualification requirements. Re-installation shall meet tolerances specified in international aquatics standards. (vi) Installation of replacement mortar bed, waterproofing membrane, tile setting mortar ceramic tiles and tile grout (tile system) by trades meeting specified qualification requirements at locations of tile demolition. Tile system shall include lettering and graphics as shown on the Tender drawings and meeting tolerances specified in international aquatics standards. Coordination of tile system with Structural, mechanical, and electrical components. nternational aquatics standards. Coordination of tile system with Structural, mechanical, and electrical components. (vii) Re-installation of deck fixtures salvaged. (c) Structural: (i) Contractors self-performing and/or subcontractors complet

Description

Description B6. SCOPE OF WORK B6.1 The Work to be done under the subsequent Contract shall consist of rehabilitation of the main tank, diving platforms, and deck area of the main tank at the Pan Am Pool. B6.2 The Pan Am Pool area will be closed to the general public for the duration of the project. (a) The East training tank, locker rooms, East concourse dryland training area and concourse level spaces to provide access to these areas will remain open to select user groups during construction. T...

Dates

Publication
5 mai 2026 à 20 h 00
Date de clôture
1 juin 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-09-09 20 h 56 min 57 s

Actualisation toutes les 2 heures