Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
tender_524661/1576887

S30103 Asset Health Indicator technical development

National Highways Limited · Royaume-Uni

Ce contrat a été attribué. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Attribué

AttribuéAutreFédéral

Renseignements généraux

Numéro de référence
tender_524661/1576887
Palier de gouvernement
Federal
Type d’appel d’offres
Other
Titre
S30103 Asset Health Indicator technical development
Identifiant de la source
e52eff2d-8212-452f-9c45-b66032c3764d-897274

Détails

Lieu
Royaume-Uni

Résumé

This Work Order is to support continued development of Asset Health Indicators to meet National Highways commitments for RIS3. The requirements of this scope have been written to reflect our current understanding of the expected commitments National Highways will need to meet during RIS3 and the proposed milestones within the Road Period. These commitments are to be finalised between NH, DfT and ORR and so requirements may change in response. The expected RIS3 commitment is: "the agreement between ORR and NH is for NH to shadow report annual data for no less than 5 asset types from the start of RP3, develop and evaluate a prototype composite index by March 2027 to see if it is viable. NH to use asset health measures as a predictive tool to inform the setting of the initial, SOFA for RIS4 from April 2027. National Highways to undertake a review, no later than Autumn 2028, of the feasibility of formally including asset health metric(s) in Performance Specification for the remainder of RIS3 and/or RIS4."

Description

This Work Order is to support continued development of Asset Health Indicators to meet National Highways commitments for RIS3. The requirements of this scope have been written to reflect our current understanding of the expected commitments National Highways will need to meet during RIS3 and the proposed milestones within the Road Period. These commitments are to be finalised between NH, DfT and ORR and so requirements may change in response. The expected RIS3 commitment is: "the agreement betwe...

Dates

Publication
14 mai 2026 à 11 h 14
Date de clôture
16 avril 2026 à 14 h 00

Valeur estimée

$500K GBP

Classification

Catégorie normalisée

Other

Source: Contracts Finder (UK)

Dernière modification : 2026-05-25 14 h 34 min 34 s

Actualisation toutes les 2 heures