RFP-2025-3-4336

This project involves engineering and design of a cantilever sidewalk on the west side of the Takhini River Bridge, located at km 196 of the Klondike Highway #2. The scope of work includes the structu

Highways & Public Works · Yukon, Canada

Cet appel d’offres a fermé le 15 mai 2025 à 19 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméTransport et logistiqueFédéral

Renseignements généraux

Numéro de référence
RFP-2025-3-4336
Palier de gouvernement
Federal
Type d’appel d’offres
Transportation & Logistics
Titre
This project involves engineering and design of a cantilever sidewalk on the west side of the Takhini River Bridge, located at km 196 of the Klondike Highway #2. The scope of work includes the structu
Source
Yukon
Identifiant de la source
RFP-2025-3-4336

Détails

Lieu
Yukon, Canada

Résumé

This project involves engineering and design of a cantilever sidewalk on the west side of the Takhini River Bridge, located at km 196 of the Klondike Highway #2. The scope of work includes the structural design of the sidewalk, strengthening of truss elements, and the replacement of bridge bearings as required. The Consultant shall be responsible for delivering a fully integrated design that considers constructability, staging, and traffic impacts. The final design shall enable the safe, durable, and functional addition of active transportation infrastructure while preserving the structural integrity of the existing bridge. The work will be done in the Community of Whitehorse and the Traditional Territories of Ta?an Kw?ch??n Council & Kwanlin D?n First Nation.

Description

This project involves engineering and design of a cantilever sidewalk on the west side of the Takhini River Bridge, located at km 196 of the Klondike Highway #2. The scope of work includes the structural design of the sidewalk, strengthening of truss elements, and the replacement of bridge bearings as required. The Consultant shall be responsible for delivering a fully integrated design that considers constructability, staging, and traffic impacts. The final design shall enable the safe, durable...

Dates

Publication
3 avril 2025 à 12 h 00
Date de clôture
15 mai 2025 à 19 h 00

Classification

Catégorie normalisée

Transportation & Logistics

Source: Yukon