Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
PMU Civil Engineer - Infrastructure 1
Green Plan · International
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- G-GP-CS-INDV7 (M)
- Organisme émetteur
- Green Plan · Voir l'historique des attributions →
- Palier de gouvernement
- international
- Type d’appel d’offres
- Professional & Consulting Services
- Titre
- PMU Civil Engineer - Infrastructure 1
- Source
- World Bank
- Identifiant de la source
- OP00453532
Détails
- Lieu
- International
Résumé
REQUEST FOR EXPRESSIONS OF INTEREST Civil Engineer – Infrastructure # 1 – Green Plan (Proc. Ref.: G-GP-CS-INDV7M) Country: Republic of Lebanon Project Name: Green, Agri-Food Transformation and Economic Recovery (Gate). Loan Nº: IBRD Loan No.9576-LB. Assignment Title: Civil Engineer – Infrastructure # 1 (Local Expert) – Green Plan Ref. Proc.: G-GP-CS-INDV7M 1. Project Background The Republic of Lebanon (the Borrower) represented by the Council for Development and Reconstruction (CDR) has received a loan from the International Bank for Reconstruction and Development (IBRD) in the amount of US$ 200 million toward the cost of the Green, Agri-food Transformation for Economic Recovery Project (GATE). The Green Plan (GP), delegated by the Council for Development and Reconstruction (CDR) to implement and manage Subcomponent 2.1, intends to allocate part of the loan proceeds to eligible payments under contracts for consulting services to be procured under this subcomponent. These services include the recruitment of a Local Individual Consultant to serve as Civil Engineer – Infrastructure # 1 under the Green Plan for the GATE Project. The consulting services include providing comprehensive technical assessment on hill lakes designs and day to day construction supervision for the implementation of hill lakes and irrigation networks and rehabilitation of roads in (sub-component 2.1)[1] ensuring that all works are executed in accordance with approved designs, contractual requirements, applicable national regulations and World Bank requirements. The assignment encompasses the following elements: 1. Technical assessment and planning (Check ToR for full details) 2. Technical supervision and implementation support (Check ToR for full details) 3. Contract and procurement management (Check ToR for full details) 4. Compliance, reporting and coordination (Check ToR for full details) 5. Support to World Bank Environmental and Social Framework Implementation (Check ToR for full details) The Terms of Reference (ToR) for the assignment are attached to this Request for Expressions of Interest. 2. Expression of Interest (EOI) The Green Plan (GP) now invites eligible local experts (“Individual Consultants”) to express their interest in providing the required services. Interested candidates should submit information demonstrating that they possess the necessary qualifications and relevant experience to perform the tasks by submitting their Expression of Interest ("EOI") and their Curriculum Vitae (CV). It is preferable to limit the EoI to a maximum of 10 pages including the CV as per attached CV format. Pages beyond 10 will not be reviewed. 3. Shortlisting Criteria Candidates will be shortlisted based on the following criteria: · Education: - At least a Bachelor’s degree in Civil Engineering. · Experience: - Minimum seven (7) years of professional experience in infrastructure projects. - At least four (4) years of experience in planning, design, and supervision of roads and water infrastructure structures (hill lakes, reservoirs, dams, large-scale irrigation networks, or similar works with demonstrated experience in technical site assessments and field investigations, as well as the preparation of Bills of Quantities (BoQs). - Experience in donor-funded projects, preferably with the World Bank is an asset. · Computer skills and Languages: - Proficiency in Arabic and English (written and spoken). - Proficiency in AutoCAD, and Microsoft Office applications. · Professional Competencies: - Demonstrated ability to identify technical and site-related issues and propose or implement appropriate corrective actions in a timely manner. - Demonstrated ability to communicate effectively with consultants, contractors and site engineers and to prepare clear, accurate, and timely reports on site progress, technical issues, and implementation challenges. The attention of interested Consultants is drawn to paragraph 3.14, 3.16 and 3.17 of the World Bank’s Procurement Regulations for IPF Borrowers for Goods, Works and Non-Consulting Services and Consulting Services dated November 2020 (Procurement Regulations) setting forth the World Bank’s policy on conflict of interest. Shortlisted Consultants will be invited for interview, upon which a Consultant will be selected for negotiation in accordance with the Individual Consultant Selection described in the “World Bank Procurement Regulations for IPF Borrowers. Further information can be obtained in writing through the email address gpproc.gate@gmail.com during office hours (8:00 am to 15:30 pm Beirut Time). Expressions of interest in the form of Curriculum Vitae (CV) must be delivered in a written form to the email address gpproc.gate@gmail.com with the job title in the subject not later than June 26, 2026 at 12:00 noon (Beirut local time).
Description
REQUEST FOR EXPRESSIONS OF INTEREST Civil Engineer – Infrastructure # 1 – Green Plan (Proc. Ref.: G-GP-CS-INDV7M) Country: Republic of Lebanon Project Name: Green, Agri-Food Transformation and Economic Recovery (Gate). Loan Nº: IBRD Loan No.9576-LB. Assignment Title: Civil Engineer – Infrastructure # 1 (Local Expert) – Green Plan Ref. Proc.: G-GP-CS-INDV7M 1. Project Background The Republic of Lebanon (the Borrower) represented by the Council for Development and Reconstruction (CDR...
Dates
- Publication
- 24 juin 2026 à 20 h 00
- Date de clôture
- 24 juin 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: World Bank
Dernière modification : 2026-09-09 20 h 58 min 00 s
Actualisation toutes les 2 heures