Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Lawson Heights Personal Care Washroom Renovation
Saskatoon Public Schools · Saskatchewan, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- SPSD-T2526-0016
- Organisme émetteur
- Saskatoon Public Schools · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Lawson Heights Personal Care Washroom Renovation
- Source
- SaskTenders
- Identifiant de la source
- c1478e90-3a3d-406a-ad28-6e0c68949e38
Détails
- Lieu
- Saskatchewan, Canada
Résumé
The Work includes but may not be limited to removal of existing flooring, toilet partitions, millwork, plumbing fixtures, concrete block and patching and repair of existing surfaces to make good. Construction of a new Personal Care Washroom and adjacent Gender-Neutral Washroom in an existing Changing Room. Construction will include new ceramic tile flooring, interior painting, new washroom accessories, new millwork and associated mechanical and electrical work. Protection of interior spaces from dust and debris under Work area, and final cleaning of interior areas affected by the Work is to be included. Bids must be accompanied by a Bid Bond in the amount of ten percent (10%) of the Bid Price. Refer to the bid documents for additional enclosures. The Owner reserves the right to reject any or all bids received and will not necessarily accept the lowest bid. Questions about the tender should be directed Jill Dusyk (email: jdusyk@andarchitecture.ca).Bids will be received by the Saskatoon Public Schools by email:facilities@spsd.sk.caAttention: Jacie Patzer, Manager of Project Services Site walk-through: Wednesday, March 25, 2026 at 4:00 p.m.
Description
The Work includes but may not be limited to removal of existing flooring, toilet partitions, millwork, plumbing fixtures, concrete block and patching and repair of existing surfaces to make good. Construction of a new Personal Care Washroom and adjacent Gender-Neutral Washroom in an existing Changing Room. Construction will include new ceramic tile flooring, interior painting, new washroom accessories, new millwork and associated mechanical and electrical work. Protection of interior spaces from...
Dates
- Publication
- 17 mars 2026 à 06 h 00
- Date de clôture
- 9 avril 2026 à 10 h 00
Documents
Comment soumissionner
Classification
Catégorie normalisée
Source: SaskTenders
Dernière modification : 2026-09-09 20 h 58 min 12 s
Actualisation toutes les 2 heures