CFB Goose Bay EPC – Request for Pre-Qualifications – Remote Bldg Electrification
MCW Group of Companies · West Coast-Northern Peninsula-Labrador, Terre-Neuve-et-Labrador, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000322142
- Organisme émetteur
- MCW Group of Companies · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- CFB Goose Bay EPC – Request for Pre-Qualifications – Remote Bldg Electrification
- Source
- MERX Manitoba
- Identifiant de la source
- 0000322142
Détails
- Lieu
- West Coast-Northern Peninsula-Labrador, Terre-Neuve-et-Labrador, Canada
Résumé
Description CFB Goose Bay Energy Performance Contract – Request for Pre-Qualifications - Remote Building Electrification Program MCW Custom Energy Solutions is seeking qualified trade contractors for upcoming remote building electrification work at 5 Wing Goose Bay, NL. This work forms part of the CFB Goose Bay Energy Performance Contract and includes work within existing buildings that will support the broader transition away from centralized steam distribution and toward electrified building heating systems. The scope is intended to attract qualified mechanical, electrical, controls, BAS, commissioning, testing, insulation, firestopping, balancing, and related specialty contractors with experience working in existing occupied facilities, active institutional or military environments, and projects requiring coordination with ongoing building operations. The CFB Goose Bay EPC includes requirements related to Indigenous Business Participation. MCW supports these objectives and encourages proponents to consider opportunities for meaningful Indigenous participation as part of their delivery approach. Applicable requirements and reporting expectations will be outlined in the tender documents and contract conditions. All firms working on site will be required to satisfy applicable CFB Goose Bay access, security, safety, and work restriction requirements. Trade Contractors and applicable subcontractors should have, or be able to obtain, the required organizational and personnel security clearances for work on a Canadian Forces Base. Remote Building Electrification Program General Scope This package will be delivered through one or more trade packages and includes all labour, materials, equipment, supervision, services, coordination, testing, commissioning, and incidentals required to complete the remote building electrification work. The scope generally includes demolition, modification, installation, integration, testing, commissioning, and closeout for mechanical, electrical, and controls systems within existing buildings. The work includes heating system demolition and new work, ventilation system demolition and new work where indicated, electrical demolition and new work, BAS and controls integration, equipment connections, panel and power distribution modifications, metering, firestopping, painting and finish restoration, testing and balancing, commissioning support, training, and closeout documentation. Final scopes, package limits, building limits, phasing, shutdown requirements, and interface responsibilities will be defined in the issued tender documents. Typical inclusions: Heating system demolition and new work within existing buildings, including removal, modification, replacement, and installation of heating equipment, piping, valves, accessories, supports, insulation, identification, and related components as shown in the drawings and specifications. Ventilation system demolition and new work where indicated, including ductwork, dampers, louvers, fans, air distribution devices, accessories, supports, insulation, balancing, controls interfaces, and associated mechanical work required for complete and operable systems. Electric resistance heating equipment and associated accessories, including electric air coils, safety controls, isolation disconnects, power connections, control wiring interfaces, field testing, and coordination with airside systems. Mechanical piping and equipment support work, including hangers, supports, welding where required, equipment insulation, piping insulation, valves, strainers, identification, cleaning, flushing, testing, and related mechanical coordination. Testing, adjusting, and balancing for HVAC systems, including coordination with mechanical, electrical, BAS, and commissioning activities. BAS and controls work, including building controllers, field control devices, BAS network equipment, BAS front end integration, device interfacing, control wiring, conduit, control panels, graphics, point integration, sequences, trend logs, commissioning support, and operator training. Electrical demolition and new work, including conduit, wire, cable, boxes, pull boxes, junction boxes, grounding, panelboards, dry type transformers, disconnect switches, motor starters, metering, switchboard instruments, terminations, identification, testing, and commissioning. Electrical connections to new mechanical and controls equipment, including power wiring, control wiring interfaces, interlocks, disconnects, starters, and equipment-specific requirements. Firestopping, sleeves, penetration sealing, patching, and related trade interface work required to maintain existing fire separations and complete all mechanical, electrical, and controls penetrations through rated assemblies. Painting, touch-ups, and finish restoration associated with demolition, new installation, equipment removal, penetrations, supports, and disturbed surfaces. Waste management, demolition debris handling, recycling, dispo
Description
Description CFB Goose Bay Energy Performance Contract – Request for Pre-Qualifications - Remote Building Electrification Program MCW Custom Energy Solutions is seeking qualified trade contractors for upcoming remote building electrification work at 5 Wing Goose Bay, NL. This work forms part of the CFB Goose Bay Energy Performance Contract and includes work within existing buildings that will support the broader transition away from centralized steam distribution and toward electrified building h...
Dates
- Publication
- 12 mai 2026 à 20 h 00
- Date de clôture
- 2 juin 2026 à 20 h 00