Wet Demolition of 785 Main Street

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 2 juillet 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000325305
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Wet Demolition of 785 Main Street
Identifiant de la source
0000325305

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of Wet demolition/Site clean-up of 785 Main street – Foundation to remain in place. D2.2 The funds available for this Contract are Three Hundred Thousand Dollars ($300,000) D2.3 Further to C6, (a) The City has applied for the Demolition Permit on behalf of the Contractor; Effective January 1, 2023, the Demolition Contractor must have their City of Winnipeg demolition contractor license and therefore be allowed to complete the permit process to demolish a building/structure or a part of a building/structure. (b) The City has arranged to have the gas and hydro connections disconnected and meters removed by others. (c) ACM removal as per specification listed under Part E – Specifications (d) The awarded contractor must notify the Workplace Safety and Health Director’s Office at least 5 days before beginning the work to alter or demolish the building structure that contains ACM that may release into the atmosphere as per Regulation 37.8(2). The contractor must also supply the Contract Administrator the Workplace Safety and Health Tracking number information for our records a minimum of Two (2) days prior to starting onsite. (e) Awarded Contractor to provide a Structural Engineers report detailing the demolition process ensuring the safety of neighboring structures. Report, along with the Professional Designer’s Certificate for Housing – Version 1.0 will be submitted to the Contract Administrator for submittal to the Permit Branch for the approval of the demolition permit. See more

Description

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of Wet demolition/Site clean-up of 785 Main street – Foundation to remain in place. D2.2 The funds available for this Contract are Three Hundred Thousand Dollars ($300,000) D2.3 Further to C6, (a) The City has applied for the Demolition Permit on behalf of the Contractor; Effective January 1, 2023, the Demolition Contractor must have their City of Winnipeg demolition contractor license and therefore be allowe...

Dates

Publication
18 juin 2026 à 20 h 00
Date de clôture
2 juillet 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-09-09 20 h 58 min 12 s

Actualisation toutes les 2 heures