Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
RFP-2025-6-4532

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig

Highways & Public Works · Yukon, Canada

Cet appel d’offres a fermé le 10 juillet 2025 à 19 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
RFP-2025-6-4532
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig
Source
Yukon
Identifiant de la source
RFP-2025-6-4532

Détails

Lieu
Yukon, Canada

Résumé

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilization of the bridge foundations, bearing assemblies, and approach infrastructure. The work will be done in the Traditional Territories of Na-cho Ny?k Dun, Tr'ond?k Hw?ch'in and Vuntut Gwitchin First Nation.

Description

This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilizatio...

Dates

Publication
16 juin 2025 à 10 h 00
Date de clôture
10 juillet 2025 à 19 h 00

Classification

Catégorie normalisée

Construction & Infrastructure

Source: Yukon

Dernière modification : 2026-11-29 13 h 31 min 38 s

Actualisation toutes les 2 heures