Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig
Highways & Public Works · Yukon, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- RFP-2025-6-4532
- Organisme émetteur
- Highways & Public Works · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Hig
- Source
- Yukon
- Identifiant de la source
- RFP-2025-6-4532
Détails
- Lieu
- Yukon, Canada
Résumé
This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilization of the bridge foundations, bearing assemblies, and approach infrastructure. The work will be done in the Traditional Territories of Na-cho Ny?k Dun, Tr'ond?k Hw?ch'in and Vuntut Gwitchin First Nation.
Description
This project involves engineering services for two critical bridge sites in Yukon: Clear Creek Bridge at kilometre 594 on Klondike Highway #2, and Eagle River Bridge at kilometre 377.8 on Dempster Highway #5. The scope includes the design of scour protection measures at Clear Creek Bridge to address active foundation erosion, and a phased investigation program at Eagle River Bridge, comprising geotechnical investigations, structural assessments, and conceptual design development for stabilizatio...
Dates
- Publication
- 16 juin 2025 à 10 h 00
- Date de clôture
- 10 juillet 2025 à 19 h 00
Classification
Catégorie normalisée