Construction of Poured Concrete Slabs

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 16 avril 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000317131
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Construction of Poured Concrete Slabs
Identifiant de la source
0000317131

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of poured concrete slab, material and labour at Transcona and/or Brookside Cemetery in accordance with the specifications attached for the period from date of award until April 25, 2027, with the option of four (4) mutually agreed upon one (1) year extensions. D2.1.1 The City may negotiate the extension option with the Contractor within ninety (90) Calendar Days prior to the expiry date of the Contract. The City shall incur no liability to the Contractor as a result of such negotiations. D2.1.2 Changes resulting from such negotiations shall become effective on May 1 of the respective year. Changes to the Contract shall not be implemented by the Contractor without written approval by the Contract Administrator. D2.1.3 Bidders are advised that, in future, the City may be participating in collaborative procurement initiatives with other levels of government. Accordingly, extensions to this Contract may not be exercised. D2.2 The major components of the Work are as follows: D2.2.1 The Contractor shall supply material and labour to pour concrete slabs at Transcona and/or Brookside Cemetery in accordance with the requirements hereinafter specified. (a) Supply and install all wood formwork; (b) Supply and install 8” (in) of gravel, which shall be compacted as per attached drawings; (c) Supply and install rebar as per attached drawings; (d) Supply and install concrete as per attached drawings; (e) Provide control joints as per attached drawings; (f) Remove all forms from the City of Winnipeg property after the work is completed; (g) Contractor is responsible for the excavation of the site and will backfill after the completion of work; (h) Contractor to ensure top of concrete slab is level to the satisfaction of the Contract Administrator; and (i) If slab being poured is to be a replacement of existing slab, the removal of existing slab will be done by City of Winnipeg. D2.3 The Work shall be done on an "as required" basis during the term of the Contract. D2.3.1 The type and quantity of Work to be performed under this Contract shall be as authorized from time to time by the Contract Administrator and/or Users. D2.3.2 Notwithstanding C7.4, the City shall have no obligation under the Contract to purchase any quantity of any item in excess of their actual operational requirements. D2.4 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work. See more

Description

Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of poured concrete slab, material and labour at Transcona and/or Brookside Cemetery in accordance with the specifications attached for the period from date of award until April 25, 2027, with the option of four (4) mutually agreed upon one (1) year extensions. D2.1.1 The City may negotiate the extension option with the Contractor within ninety (90) Calendar Days prior to the expiry date of the Contract. The C...

Dates

Publication
11 mars 2026 à 20 h 00
Date de clôture
16 avril 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-09-09 20 h 58 min 55 s

Actualisation toutes les 2 heures