Temporary Works Designer (Track Design Railhead)
Ferrovial BAM Rail Systems · Royaume-Uni
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- C4N111835572
- Organisme émetteur
- Ferrovial BAM Rail Systems · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Temporary Works Designer (Track Design Railhead)
- Source
- Contracts Finder (UK)
- Identifiant de la source
- 81a4ff89-4284-48d5-91e5-4b8dedd0ec22-895689
Détails
- Lieu
- Royaume-Uni
Résumé
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate temporary railheads/connections to the Network Rail infrastructure, to meet the construction logistics requirements for material deliveries by rail and support the requirements of other Railway System Contractors from the Alliance. These railheads/connections require temporary rail track works that will not form part of the final permanent works. The Temporary Railhead designs required are located at: • West Ruislip (Copthall) Temporary Railhead • Chiltern South Temporary Railhead • Berkswell Temporary Railhead • Washwood Heath Temporary Connection The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer. The scope of this required design works are as follows - Track layout and geometry, Track, Track drainage, LWR and S&C hardstanding areas, gantry foundations. Potential mobilization start (soft start) in September 2026 - then estimated full start February 2027.
Description
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate temporary railheads/connections to the Network Rail infrastructure, to meet the construction logistics requirements for material deliveries by rail and support the requirements of other Railway System Contractors from the Alliance. These railheads/connections require temporary rail track works that will not form part of the final permanent works. The Temporary Railhead designs required a...
Dates
- Publication
- 1 mai 2026 à 04 h 10
- Date de clôture
- 15 mai 2026 à 11 h 30
Valeur estimée
$2.5M GBP