Catcliffe & Treeton Flood Alleviation Scheme (Treeton Lane Bridge) - 2 Stage Pre-Construction Services and Works
Rotherham Metropolitan Borough Council · Royaume-Uni
Temps restant pour soumissionner
Attribué
Renseignements généraux
- Numéro de référence
- 20260811133141-104118
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Catcliffe & Treeton Flood Alleviation Scheme (Treeton Lane Bridge) - 2 Stage Pre-Construction Services and Works
- Source
- Contracts Finder (UK)
- Identifiant de la source
- 3813b09b-3b65-45ca-b96a-9ec38bcb0706-910249
Détails
- Lieu
- Royaume-Uni
Résumé
This is a two stage design and build for Catcliffe and Treeton Flood Alleviation Shceme (Treeton lane Bridge). The site is located South of Rotherham on B6067 Treeton Lane, Catcliffe, Rotherham, South Yorkshire. A detailed hydrological and hydraulic analysis has been undertaken and concluded the existing bridge can not accommodate the flow during flood conditions. Therefore, the freeboard and the hydraulic capacity of the bridge needed to be increased. Based on the structural condition of the existing structure, the economic and financial feasibility of road improvements, and road capacity issues, it is proposed that the existing structure be raised by approximately 900mm at the same location over the Rother River. The preferred option would be a precast ""TY"" beam with an in-situ concrete deck slab supported by the existing abutments. However, the suitability of this option will need to be assessed as part of the Design phase. This is a further competition via YORCivil 3 South and West Region Lot 3 Additional information: Value Duration
Description
This is a two stage design and build for Catcliffe and Treeton Flood Alleviation Shceme (Treeton lane Bridge). The site is located South of Rotherham on B6067 Treeton Lane, Catcliffe, Rotherham, South Yorkshire. A detailed hydrological and hydraulic analysis has been undertaken and concluded the existing bridge can not accommodate the flow during flood conditions. Therefore, the freeboard and the hydraulic capacity of the bridge needed to be increased. Based on the structural condition of the ex...
Dates
- Publication
- 11 août 2026 à 08 h 31
- Date de clôture
- 1 mai 2026 à 11 h 00
Valeur estimée
$165K GBP