Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Professional Consulting Services for Assiniboine South Recreation Campus
The City of Winnipeg · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000315800
- Organisme émetteur
- The City of Winnipeg · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Professional Consulting Services for Assiniboine South Recreation Campus
- Source
- MERX Manitoba
- Identifiant de la source
- 0000315800
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Description Full TItle: Professional Consulting Services for Assiniboine Southwest Recreation Campus Feasibility Study. D4. SCOPE OF SERVICES D4.1 Project Background and Objectives (a) Plan for a modern, accessible, program responsive regional recreation facility/campus on City-owned land in Marj Edey Park to serve the Assiniboine South area (b) Address aging facilities, programming gaps, and growth pressures; identify opportunities to leverage or consolidate community resources; and provide phased implementation guidance anchored by public/stakeholder input. (c) Produce concept designs, presentation renderings, and Class 5 cost estimates to inform future City decisions. (d) Proceeding to Phase 2 is at the City’s sole discretion upon acceptance of Phase 1 deliverables. D4.2 General Requirements (Apply to Both Phases) (a) Team composition: Lead consulting team with parks/recreation planning expertise; dedicated Public Engagement Lead; capacity for data collection and analysis, site planning, concept architecture, landscape architecture, engineering disciplines as required, cost estimating, and data visualization, GIS mapping, graphic design/communications. (b) Meetings and reporting: In the Work Plan, set meeting cadence, standing agendas, decision gates, and a milestone schedule. Minimum: project kickoff, regular status updates, task end workshops, and written progress reports. Finalize with the City at kickoff; the City may adjust during the assignment. (c) Standards, compliance, and digital: Follow City of Winnipeg standards/templates, the Accessibility for Manitobans Act (AMA), FIPPA, and universal design best practices. Provide Class 5 cost estimates (). All digital submissions must meet City CAD/GIS standards for formats, file naming, and metadata; use industry best practices where not specified. D4.3 Phase 1 — Community Needs Assessment and Forecasting D4.3.1 Project Initiation (a) Proponent-led kickoff to confirm scope, roles, schedule, and risk register. (b) Submit Phase 1 Work Plan and Engagement Plan (methods, audiences, timelines, accessibility measures). D4.3.2 Policy and Background Review (including Joint Use/Partnership Scan) (a) Synthesize applicable City/regional policies and plans (recreation, parks/green space, transportation, secondary/precinct), and include a concise scan of existing/potential Joint Use Agreements (e.g., school divisions) and partnerships (public/not for profit/private) that could leverage or consolidate resources, with recommended priority opportunities for testing in Phase 2. (b) Review prior plans and studies provided by the City (e.g., Varsity View 2016 and 2012, Bill Clement Parkway Extension) and summarize implications for this feasibility study. D4.3.3 Demographics and Demand Forecasting (a) Establish baseline demographics and equity considerations for the service area. (b) Forecast recreation participation and facility needs at 10/20/30 year horizons; benchmark provision ` ratios to identify gaps. D4.3.4 Inventory and Usage Assessment (a) Inventory existing parks and recreation service providers/organizations and amenities (community centres, outdoor rinks, indoor arenas, outdoor courts, fields/diamonds, indoor/outdoor pools, wading pools, spray pads and indoor gyms) within the study area and adjacent catchments (b) Document utilization patterns where data exists (peak/shoulder use, access constraints, seasonal dynamics). Building condition assessments are expressly excluded. D4.3.5 Site Base Information — Marj Edey Park (a) Conduct a basic topographic and legal boundary survey of the site (no subsurface locates), capturing contours, spot elevations, visible utilities, circulation/parking, fields/courts, structures, key trees, and surface drainage indicators; and prepare a concise constraints/opportunities memo based on desktop review (access, transit/active transportation links, zoning requirements, easements and/or setbacks, environmental/heritage flags, drainage/flood considerations, CPTED). D4.3.6 Round 1 Engagement (a) Objective: (i) Engage with external stakeholder organizations to collect information on their organizational priorities and service provision, assess current facility utilization, identify opportunities and challenges, and explore future directions. (b) Audience: (i) Stakeholder organizations including but are not limited to community center boards, field users, facility users, youth and seniors, equity-deserving groups, neighbourhood associations. (c) Methods: (i) Structured meetings (ii) Interviews (d) City responsibilities: (i) Develop and disseminate the engagement strategy (all three rounds). (ii) Develop and coordinate website content. (e) Proponent responsibilities: (i) Conduct stakeholder mapping to identify and categorize stakeholder organizations based on inter
Description
Description Full TItle: Professional Consulting Services for Assiniboine Southwest Recreation Campus Feasibility Study. D4. SCOPE OF SERVICES D4.1 Project Background and Objectives (a) Plan for a modern, accessible, program responsive regional recreation facility/campus on City-owned land in Marj Edey Park to serve the Assiniboine South area (b) Address aging facilities, programming gaps, and growth pressures; identify opportunities to leverage or consolidate community resources; and provide pha...
Dates
- Publication
- 26 février 2026 à 19 h 00
- Date de clôture
- 26 mars 2026 à 20 h 00
Classification
Catégorie normalisée
Source: MERX Manitoba
Dernière modification : 2026-09-02 11 h 51 min 37 s
Actualisation toutes les 2 heures