Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
EG-EEAA-544823-CS-QCBS

Task 1: Engineering Consultant services for the preparation of the detailed design and engineering package for Ameriyah depot administrative buildings rehabilitation and; Task 2: Full site supervision services for both Ameriyah depot & Admin Bldgs

Egyptian Environmental Affairs Agency · International

Cet appel d’offres a fermé le 19 mai 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméServices professionnels et de consultationinternational

Renseignements généraux

Numéro de référence
EG-EEAA-544823-CS-QCBS
Palier de gouvernement
international
Type d’appel d’offres
Professional & Consulting Services
Titre
Task 1: Engineering Consultant services for the preparation of the detailed design and engineering package for Ameriyah depot administrative buildings rehabilitation and; Task 2: Full site supervision services for both Ameriyah depot & Admin Bldgs
Identifiant de la source
OP00442683

Détails

Lieu
International

Résumé

REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES Arab Republic of Egypt GREATER CAIRO AIR POLLUTION MANAGEMENT AND CLIMATE CHANGE “GCCC” PROJECT - PROJECT (P172548) Engineering Consultant firm, to prepare the detailed design, engineering package for Ameriyah depot administrative buildings rehabilitation and full site supervision for the depot retrofitting — Issued in Two Separate Contracts — Reference No. (as per Procurement Plan): EG-EEAA-544823-CS-QCBS I. Background As part of the “Sustainable Development Strategy (SDS): Egypt Vision 2030” the country committed to halving its fine particulate matter (PM10) air pollution by 2030. Significant improvements have been made towards that goal in recent years. In fact, Cairo’s PM10 concentration fell by about 25 percent over the past decade. Despite these improvements, the city’s pollution levels are still several times the WHO recommended concentrations and higher than national guidelines taking as these high levels are taking their toll on the health and quality of life of the population, in particular poor people. In response to this situation, the approved World Bank-financed Greater Cairo Air Pollution Management and Climate Change Project aims at reducing air emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The Project aims more specifically at reducing air emissions which is a key step toward the reduction of pollution concentrations and improvement of air quality. The Project will focus on the two main sources of air pollution: open burning of solid waste and vehicle emissions and will geographically cover Greater Cairo (i.e., Cairo, Giza and Qalyoubia Governorates --GC); and will include four main components aiming at: (i) enhancing the air quality decision support system in Egypt; (ii) improving Solid Waste Management services; (iii) reducing air and climate pollutants from vehicle emissions; and (iv) furthering stakeholder engagement, awareness and communication. Component 3 Vehicle Emission Reduction Under this component, the Project will support activities aimed at reducing vehicle emissions from the public transport sector. 100 electric buses and the equipment required to operate and maintain these buses are procured. To integrate the electric buses, the project will retrofit existing bus depots with charging stations, upgraded power supply, and safety equipment. The activities will support the Cairo Transport Authority (CTA), which will operate the electric buses. The Project will upgrade facilities at CTA, including the retrofitting of existing bus depots with electric charging stations, power supply and related safety equipment; training CTA staff such as bus drivers and mechanics on operating and maintaining the new e-equipment. The Ministry of Environment, through the Egyptian Environmental Affairs Agency (EEAA), is the project’s borrower, while CTA is the beneficiary responsible for implementation. By investing in e-bus technology, modernizing infrastructure, and strengthening operational capacity, this component plays a key role in Egypt’s green transport transition, reducing emissions and setting a model for future urban mobility. II. Assignment Description The Depot retrofitting tender is issued with all depot drawings and details that will be made available in the RFP that will be sent only to the shortlisted firms. The requested services covered by these terms of reference are to support the Project Coordination Unit (PCU) and the Technical Implementation Units (TIUs) of “Greater Cairo Air Pollution Management and Climate Change “GCCC” Project” in the implementation of the following two contracts services: Contract 1: Detailed Design and Engineering Package for the Administrative Buildings Rehabilitation (Lump-Sum): Preparation of detailed design and engineering package for the rehabilitation of Ameriyah depot administrative buildings, including drawings, technical specifications, cost estimates, and tender documents. Expected Duration: approximately 55 working days. The assignment covers all engineering disciplines required for the rehabilitation of the administrative buildings, including architectural, structural, MEP, Telecom/LC systems, EHS, and social considerations, and concludes with a full set of tender-ready documents. Contract 2: Design Review of Depot Retrofitting and Full Site Supervision (Time-Based): Full site supervision of depot retrofitting works and administrative building rehabilitation, including contract administration, quality control, environmental and social monitoring, and design review of depot-related works. This contract comprises three tasks: Task 1 — Design Review (3 weeks): multi-discipline review and verification of the completed depot retrofitting design; Task 2 — Full Site Supervision (14 months): comprehensive on-site supervision of all depot retrofitting and administrative buildings rehabilitation works; T

Description

REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES Arab Republic of Egypt GREATER CAIRO AIR POLLUTION MANAGEMENT AND CLIMATE CHANGE “GCCC” PROJECT - PROJECT (P172548) Engineering Consultant firm, to prepare the detailed design, engineering package for Ameriyah depot administrative buildings rehabilitation and full site supervision for the depot retrofitting — Issued in Two Separate Contracts — Reference No. (as per Procurement Plan): EG-EEAA-544823-CS-QCBS I. Background As part of th...

Dates

Publication
3 mai 2026 à 20 h 00
Date de clôture
19 mai 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Professional & Consulting Services

Source: World Bank

Dernière modification : 2026-09-09 21 h 00 min 47 s

Actualisation toutes les 2 heures