Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Provision of BMS System MEICA-BMS-01
V V B Engineering (UK) Ltd · Royaume-Uni
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- C4N123590883
- Organisme émetteur
- V V B Engineering (UK) Ltd · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Information Technology
- Titre
- Provision of BMS System MEICA-BMS-01
- Source
- Contracts Finder (UK)
- Identifiant de la source
- 4b0cfa78-7a75-418d-a17d-4af9633137b7-922032
Détails
- Lieu
- Royaume-Uni
Résumé
The scope of works includes a two-stage delivery approach covering the complete design, supply, configuration, integration, testing and installation of the Building Management System for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. The centralised system at each location shall comprise of a dedicated BMS panel with dual-redundant PLCs, HMIs, remote interface enclosures and a dedicated BMS LAN, and distributed interface enclosures located within the relevant plant rooms to facilitate communications between plant systems and provide connectivity to the HS2 Network Integrated Control Centre (NICC). The BMS shall integrate the mechanical and electrical building services, providing monitoring, control, alarm management, and operator interfaces for the pumping stations and portal building. The system shall be designed in accordance with the project control strategy and applicable HS2 technical standards while coordinating with interfacing subcontractors to ensure seamless integration of all connected systems. The proposed BMS shall provide monitoring, control, alarms and graphical visualisation for HVAC, LV distribution and metering, UPS, lighting, fire alarms, public health services, pumped drainage and disabled toilet alarms. The scope also includes reviewing design inputs, updating the Functional Design Specification and generic drawings, and coordinating all interfaces required for full mechanical and electrical system integration. Sella Controls will also assess the cyber security risks associated with the BMS system. Additional information: Please review the Scope of work and drawings for the works.
Description
The scope of works includes a two-stage delivery approach covering the complete design, supply, configuration, integration, testing and installation of the Building Management System for Canley Brook, Burton Green and Stoneleigh Pumping Stations under the HS2 N1/N2 MEICA works. The centralised system at each location shall comprise of a dedicated BMS panel with dual-redundant PLCs, HMIs, remote interface enclosures and a dedicated BMS LAN, and distributed interface enclosures located within the...
Dates
- Publication
- 19 novembre 2026 à 05 h 30
- Date de clôture
- 25 novembre 2026 à 12 h 00
Valeur estimée
$2.5M GBP
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-11-26 00 h 27 min 53 s
Actualisation toutes les 2 heures