Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Accelerating high-voltage direct current (HVDC) development in Vietnam
PALLADIUM INTERNATIONAL LIMITED · Royaume-Uni
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- EDPACT_ED42
- Organisme émetteur
- PALLADIUM INTERNATIONAL LIMITED · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Environmental Services
- Titre
- Accelerating high-voltage direct current (HVDC) development in Vietnam
- Source
- Contracts Finder (UK)
- Identifiant de la source
- ca25b528-3873-4047-bc87-47e394c4d76c-907692
Détails
- Lieu
- Royaume-Uni
Résumé
The UK Government's Partnering for Accelerated Climate Transitions (UK PACT) programme is inviting quotations from qualified suppliers or consortia to provide technical assistance to Electricity of Vietnam (EVN) and the National Power Transmission Corporation (EVNNPT) to strengthen institutional, technical, and regulatory capacity for the development and deployment of High Voltage Direct Current (HVDC) transmission infrastructure in Vietnam. Vietnam's rapidly growing power system faces increasing challenges associated with the uneven geographical distribution of generation resources and demand centres. As renewable energy deployment accelerates, particularly offshore wind and large-scale solar power, the national grid is experiencing growing transmission constraints, power losses, and risks to system stability. Limited land availability for new transmission corridors has highlighted the importance of modern transmission technologies to support the country's energy transition. The Revised National Power Development Plan (PDP8) identifies HVDC infrastructure as a strategic priority for strengthening transmission capacity, improving grid flexibility and reliability, reducing electrical losses, and enabling higher penetration of renewable energy. The plan includes the development of multiple HVDC transmission corridors, converter stations, and associated infrastructure from 2031 onwards. Through this assignment, UK PACT will support EVN and EVNNPT to assess the technical, economic, institutional, and regulatory requirements for HVDC deployment in Vietnam. The selected supplier will review the existing policy and regulatory framework, evaluate the feasibility of planned HVDC investments, assess suitable technology options, and develop practical tools and guidance documents to support investment decision-making. The supplier will also undertake stakeholder mapping, assess capacity gaps within key institutions, and provide targeted technical assistance and training to strengthen national expertise in HVDC planning, modelling, investment appraisal, and system operation. In addition, the assignment will generate evidence and recommendations to support implementation of PDP8, contribute to the objectives of Vietnam's Just Energy Transition Partnership (JETP), and enhance readiness for future investment in modern transmission infrastructure. Interested suppliers are invited to review the documentation provided in this notice and submit their applications to: expertdeployments@ukpact.co.uk
Description
The UK Government's Partnering for Accelerated Climate Transitions (UK PACT) programme is inviting quotations from qualified suppliers or consortia to provide technical assistance to Electricity of Vietnam (EVN) and the National Power Transmission Corporation (EVNNPT) to strengthen institutional, technical, and regulatory capacity for the development and deployment of High Voltage Direct Current (HVDC) transmission infrastructure in Vietnam. Vietnam's rapidly growing power system faces increasi...
Dates
- Publication
- 22 juillet 2026 à 09 h 34
- Date de clôture
- 12 août 2026 à 07 h 00
Valeur estimée
$292K GBP
Comment soumissionner
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-09-09 21 h 01 min 55 s
Actualisation toutes les 2 heures