Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
0000339061

Professional Consulting Services for Tyndall Park Community Centre

The City of Winnipeg · Winnipeg, Manitoba, Canada

Consulter la source

Temps restant pour soumissionner

22j 03h 41m

OuvertConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000339061
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Professional Consulting Services for Tyndall Park Community Centre
Identifiant de la source
0000339061

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description Full Title: Professional Consulting Services for Tyndall Park Community Centre - Gymnasium Expansion See B3 - Site Investigation. D4. SCOPE OF SERVICES The disciplines/roles associated with the project team include, but are not limited to, Principalin- Charge, Project Manager, Design Team Leads (including all disciplines – Architectural, Landscape, Civil, Structural, Mechanical, Electrical), Building Envelope Specialist, Sustainability Lead, Cost Estimator (Quantity Surveyor), Commissioning and Energy Modeling Lead(s), Public and Stakeholder Engagement Lead, Accessibility Specialist, Acoustic Specialist, Transportation & Traffic Consulting, Geotechnical Engineering and Environmental Consulting. No one individual may assume more than one role on the project team. For example, the Proponent’s designated Project Manager and Public/Stakeholder Engagement Lead are individual, dedicated, and separate roles from that of the Design Leads and other roles. The Services required under this Contract shall consist of, but not limited to, the following: (a) Programming – Review and update the functional space programs for the facility as outlined in the 2019 Tyndall Park Feasibility Study to achieve a final preferred program that responds to the community centre’s programmatic and operational requirements; (b) Develop a Site Plan – site and options’ analysis leading to preferred concept design for the facility with specific attention paid to zoning, parking requirements, existing and future site features and amenities, site servicing and land drainage requirements to be considered and evaluated; (c) Preliminary Design and Design Development (schematic and 33% design development phases) - based on “Option 1” of the 2019 Tyndall Park Community Centre Feasibility Study (Appendix C) for: (i) the expansion and renovation of the facility to accommodate a full-size gymnasium, multi-purpose room and new lobby etc., while incorporating changes to the design to reflect current code requirements, City of Winnipeg Universal Design Policy and City of Winnipeg Accessibility Design Standard, site conditions and/or any other variations identified in the programming phase; (ii) plans, drawings and three-dimensional (3-D) renderings of the site, exterior, and key interior elements and; (iii) phasing plan(s) indicating how the work may be phased; (iv) completion of a current Asbestos Inventory Report of the facility with the assistance of the City’s Asbestos team. (d) Sustainability Design workshops and associated studies/reports as detailed in D6; (e) Public and stakeholder engagement as detailed in D17. (f) Cost Estimates – two (2) cost estimates, one at the completion of each phase: (i) Interim report with Class 4 cost estimate at the completion of Schematic Design Phase; and (ii) Summary report with Class 3 cost estimate at the completion of 33% Design Development Phase. D4.2 The design process will require regular project meetings with the Tyndall Park Redevelopment Committee which will include representatives of Tyndall Park Community Centre, the General Council of Winnipeg Community Centres, and the City. D4.3 The Consultant shall meet the requirements of the City’s “Building and General Construction Industry – Class of Estimate Deliverables Maturity Assessment Checklist” template for the Class 3 and 4 Cost Estimates (see Appendix A). For Class of Estimate – Deliverables Maturity Assessment Checklist, the “For the Building and General Construction Industry v1.0” spreadsheet should be referenced when compiling the Class 3 and Class 4 Cost Estimates. D4.4 The Services required under D4 shall be in accordance with the City’s Project Management Manual and templates: http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#4. Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Consulting Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. Where the Services required include Contract Administration, Consultants shall pay particular attention to the revisions to Section 9.19 and 9.20.1 of the City’s Project Management Manual in Addendum #8. D4.5 The following shall apply to the Services: (a) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions https://www.winnipeg.ca/media/3624 (b) Province of Manitoba Green Buildings Program Province of Manitoba | finance - Manitoba green building program (gov.mb.ca) (c) Winnipeg Accessibility Design Standards https://www.winnipeg.ca/services-programs/accessibility/plans-policies (d) Universal Design Policy https://www.winnipeg.ca/services-programs/accessibility/plans-policies (e) Public Engagement Guidelines https://winnipeg.ca/PublicEngagement/pdfs/PublicEngagementRequirements.pdf (f) City of Winnipeg

Description

Description Full Title: Professional Consulting Services for Tyndall Park Community Centre - Gymnasium Expansion See B3 - Site Investigation. D4. SCOPE OF SERVICES The disciplines/roles associated with the project team include, but are not limited to, Principalin- Charge, Project Manager, Design Team Leads (including all disciplines – Architectural, Landscape, Civil, Structural, Mechanical, Electrical), Building Envelope Specialist, Sustainability Lead, Cost Estimator (Quantity Surveyor), Commis...

Dates

Publication
26 novembre 2026 à 19 h 00
Date de clôture
21 décembre 2026 à 19 h 00

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-11-29 01 h 28 min 59 s

Actualisation toutes les 2 heures