Herbert School - Mechanical Controls Upgrade
Chinook School Division No. 211 · Saskatchewan, Canada
Temps restant pour soumissionner
17j 21h 35m
Renseignements généraux
- Numéro de référence
- CSD-HERB-261126
- Organisme émetteur
- Chinook School Division No. 211 · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Education & Training
- Titre
- Herbert School - Mechanical Controls Upgrade
- Source
- SaskTenders
- Identifiant de la source
- 8d2d7220-6632-4dd8-8acb-24c5bc4c06b7
Détails
- Lieu
- Saskatchewan, Canada
Résumé
The Chinook School Division (the Owner), seeks bids to perform work to replace the existing pneumatic controls, zone valves, and related equipment at Herbert School for a stipulated price. The project must be substantially completed by August 20th, 2027. Sealed tenders for Herbert School Controls Upgrade, will be received at the office of HDA Engineering Ltd. until 2:00 p.m. (CST), Thursday, December 17, 2026. A site walk through for Contractor’s will be held on Thursday, December 3, 2026 at 10:00 a.m. The walk through will take place at Herbert School. The address is 1 Connaught Avenue, Herbert, Saskatchewan. Meet at the front entrance to the school. Tenders must be submitted on the form furnished by the Consultant. Copies of the Tender Documents may be obtained from: HDA Engineering Ltd., 2334 8th Avenue, Regina, Saskatchewan (306-525-9815). The lowest or any tender will not necessarily be accepted. Tenders will be accepted from qualified Mechanical Contractor. The Owner reserves the right to reject tenders from parties without reasonable acquaintance with the class of work specified. These reservations shall apply equally to Sub-Contractors.
Description
The Chinook School Division (the Owner), seeks bids to perform work to replace the existing pneumatic controls, zone valves, and related equipment at Herbert School for a stipulated price. The project must be substantially completed by August 20th, 2027. Sealed tenders for Herbert School Controls Upgrade, will be received at the office of HDA Engineering Ltd. until 2:00 p.m. (CST), Thursday, December 17, 2026. A site walk through for Contractor’s will be held on Thursday, December 3, 2026 at 10:...
Dates
- Publication
- 26 novembre 2026 à 12 h 00
- Date de clôture
- 17 décembre 2026 à 09 h 00
Documents
Classification
Catégorie normalisée
Source: SaskTenders
Dernière modification : 2026-11-29 13 h 15 min 50 s