Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Tatsamenie Lake Enhanced Sockeye Fry Rearing to Fisheries and Oceans.
Department of Fisheries and Oceans (DFO) · Nouveau-Brunswick, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 22785002863
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Other
- Titre
- Tatsamenie Lake Enhanced Sockeye Fry Rearing to Fisheries and Oceans.
- Source
- MERX New Brunswick
- Identifiant de la source
- 22785002863
Détails
- Lieu
- Nouveau-Brunswick, Canada
Résumé
Description Beginning in Spring 2026, the Contractor is to receive all transported fry. The Contractor will be conducting rearing of approximately 200,000 to 400,000 sockeye salmon fry according to directions annually determined by the Transboundary Technical Committee and Enhancement Sub-committee at Tatsamenie Lake, BC. Rearing of fish may encounter risks to disease and predation. Monitoring and prevention is to be maintained for optimal project success. Simultaneously, a smolt mark recapture enumeration project is to be completed Mid-May until Early-September to accurately enumerate the complete Sockey salmon smolt outmigration from Tatsamenie Lake. Otolith sampling to identify the origin of smolts and standard age information. This is the first year of the proposed contract with an option to extend the contract annually in the 2027, 2028, and 2029 summer field seasons at the discretion of DFO. DFO does not own assets or infrastructure to support this project. Contractors are required to be self-sufficient throughout the completion of this project. The Contractor will be responsible for mobilization of the worksite, planning and implementing the mark recapture programs, in lake rearing of fry, providing on site supervision, fry rearing crew members, camp cook, and any other logistical support required. Specific method requirements are identified in following sections. See more
Description
Description Beginning in Spring 2026, the Contractor is to receive all transported fry. The Contractor will be conducting rearing of approximately 200,000 to 400,000 sockeye salmon fry according to directions annually determined by the Transboundary Technical Committee and Enhancement Sub-committee at Tatsamenie Lake, BC. Rearing of fish may encounter risks to disease and predation. Monitoring and prevention is to be maintained for optimal project success. Simultaneously, a smolt mark recapture ...
Dates
- Publication
- 28 avril 2026 à 20 h 00
- Date de clôture
- 13 mai 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: MERX New Brunswick
Dernière modification : 2026-09-09 21 h 03 min 12 s
Actualisation toutes les 2 heures