Sizewell C - HR Monitoring (CRX & Building) Package

Sizewell C Limited · Royaume-Uni

Cet appel d’offres a fermé le 10 avril 2026 à 12 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméTechnologies de l'informationFédéral

Renseignements généraux

Numéro de référence
C4N108307220
Palier de gouvernement
Federal
Type d’appel d’offres
Information Technology
Titre
Sizewell C - HR Monitoring (CRX & Building) Package
Identifiant de la source
5ec0fb87-1fe6-492f-9a9a-20cfb71fb2dc-890326

Détails

Lieu
Royaume-Uni

Résumé

Overview of Scope Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of: • Monitoring sensors (including extensometers, temperature probes, hydraulic levelling pots, pendulums, invar wires, inclinometers, hygrometers, and pressure sensors) • Associated cabling, connection/grouping boxes, and acquisition/data logger cabinets • All necessary software interfaces and data collection/reporting tools More than 200 sensors will be embedded and installed in both the inner containment wall and the common raft of the nuclear island. The EAU monitoring system must provide real-time and periodic data on: • Settlements and deformations of the nuclear island raft (topographical markers, hydraulic levelling pots, extensometers, and temperature sensors) • Overall containment distortions (pendulums and invar wires) • Localized deformations and tendon failure detection (embedded extensometers, local monitoring devices) • Tension in prestressed cables (dynamometers) • Environmental parameters (temperature, humidity, internal and external pressure) All EAU system components must comply with the Book of Technical Specifications (BTS) Chapter 9.04 and associated referenced as well as client installation and interface requirements. Instruments must be delivered with calibration certificates and installed in accordance with manufacturer and project-specific procedures. The EAU system contractor will also provide: • Installation studies and execution drawings for all phases (temporary/erection and permanent/operational) • Material Approval Forms, Inspection and Test Plans, Quality Release Certificates, and Lifetime Quality Records (LTQR) • Data collection, reporting formats, and periodic analysis files as required by the client (monthly/bi-monthly during construction; weekly/daily during key phases; and as specified during operation) Additional information: It will be beneficial for you to describe your business as much as possible and highlight where you can help us to achieve our values described above

Description

Overview of Scope Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of: •...

Dates

Publication
27 mars 2026 à 06 h 30
Date de clôture
10 avril 2026 à 12 h 00

Valeur estimée

$5.0M GBP

Comment soumissionner

Classification

Catégorie normalisée

Information Technology

Source: Contracts Finder (UK)

Dernière modification : 2026-09-09 21 h 03 min 24 s

Actualisation toutes les 2 heures