Adams Lake Dam B Remediation

Water Security Agency · Saskatchewan, Canada

Cet appel d’offres a fermé le 22 juillet 2026 à 10 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
2026-27-0093
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Adams Lake Dam B Remediation
Identifiant de la source
27d86246-bfb8-44c7-bfe4-757f05395ec7

Détails

Lieu
Saskatchewan, Canada

Résumé

WSA intends to engage a General Contractor remediate Adams Lake Dam B and its infrastructure in order to safely return the reservoir to its design Full Supply Level (FSL). To accomplish this, the Contractor will complete the following work, summarized at a high level as follows:Grouting the no longer in service wood stave culvert low level outlet. Installing a Corrugated Steel Pipe (CSP) insert into the existing CSP Drop Inlet. Constructing a walkway to access the infrastructure’s operator gate. Constructing a downstream toe berm with engineering granular filter. Upgrading access trail and low-level crossing with granular, as needed, for construction equipment to safely access the project site. WSA is a Treasury Board Crown corporation within the meaning of The Crown Corporations Act, 1993 (Saskatchewan) that is governed by The Water Security Agency Act (Saskatchewan). WSA is responsible for water management in the Province of Saskatchewan, which includes managing the Province’s water supply, protecting water quality, ensuring safe drinking water and the treatment of wastewater, reducing flood and drought damage, protecting aquatic habitat, and managing dams and related supply channels.

Description

WSA intends to engage a General Contractor remediate Adams Lake Dam B and its infrastructure in order to safely return the reservoir to its design Full Supply Level (FSL). To accomplish this, the Contractor will complete the following work, summarized at a high level as follows:Grouting the no longer in service wood stave culvert low level outlet. Installing a Corrugated Steel Pipe (CSP) insert into the existing CSP Drop Inlet. Constructing a walkway to access the infrastructure’s operator gate....

Dates

Publication
18 juin 2026 à 06 h 30
Date de clôture
22 juillet 2026 à 10 h 00

Documents

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure