Design, supply and installation of solar system to energize the Pelly Crossing Solid Waste Facility located at 16525 North Klondike Highway. The design and installation must include the solar capacity
Community Services · Yukon, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- RFP-2023-4-2479
- Organisme émetteur
- Community Services · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Design, supply and installation of solar system to energize the Pelly Crossing Solid Waste Facility located at 16525 North Klondike Highway. The design and installation must include the solar capacity
- Source
- Yukon
- Identifiant de la source
- RFP-2023-4-2479
Détails
- Lieu
- Yukon, Canada
Résumé
Design, supply and installation of solar system to energize the Pelly Crossing Solid Waste Facility located at 16525 North Klondike Highway. The design and installation must include the solar capacity to energize lights in the existing 10 ft x 10 ft attendant shack, an outside flood light, plug inside, electrical requirements for payment system (iPad charging, pin pad docking station, cash drawer and printer), electric heater for back-up to existing propane and a cell booster for internet. This will enable tipping fee collection which currently is not available. A back up generator and affiliated storage requirement will be required also. Propane currently heats the building. The generator can be propane supply and must include automation to transfer to that source when solar is not viable. Automation on this project will be a provisional consideration. Community: Pelly Crossing, Yukon Traditional Territory: Selkirk First Nation, White River First Nation and First Nation of Na-cho Nyak Dun
Description
Design, supply and installation of solar system to energize the Pelly Crossing Solid Waste Facility located at 16525 North Klondike Highway. The design and installation must include the solar capacity to energize lights in the existing 10 ft x 10 ft attendant shack, an outside flood light, plug inside, electrical requirements for payment system (iPad charging, pin pad docking station, cash drawer and printer), electric heater for back-up to existing propane and a cell booster for internet. This ...
Dates
- Publication
- 6 juin 2023 à 12 h 00
- Date de clôture
- 12 juillet 2023 à 19 h 00
Classification
Catégorie normalisée