Consulting Services for the Preparation of Feasibility Study, Environmental and Social Documents, Detailed Technical Design, Bills of Quantities (BOQ), Bidding Documents, and Procurement Process Support for the Construction of the 500 kV Transmission Line
OJSC "Shabakahoi intiqoli barq" · International
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- REMIT-TJ-CS-QCBS-LS-RS
- Organisme émetteur
- OJSC "Shabakahoi intiqoli barq" · Voir l'historique des attributions →
- Palier de gouvernement
- international
- Type d’appel d’offres
- Professional & Consulting Services
- Titre
- Consulting Services for the Preparation of Feasibility Study, Environmental and Social Documents, Detailed Technical Design, Bills of Quantities (BOQ), Bidding Documents, and Procurement Process Support for the Construction of the 500 kV Transmission Line
- Source
- World Bank
- Identifiant de la source
- OP00453805
Détails
- Lieu
- International
Résumé
REQUEST FOR EXPRESSIONS OF INTEREST REPUBLIC OF TAJIKISTAN Open Joint Stock Company Shabakahoi Intiqoli Barq (SIB) Project: Regional Electricity Market Interconnectivity and Trade program (P509488) Assignment Title: Consulting Services for the Preparation of Feasibility Study, Environmental and Social Documents, Detailed Technical Design, Bills of Quantities (BOQ), Bidding Documents, and Procurement Process Support for the Construction of the 500 kV Transmission Line from Rogun Hydro Power Plant (HPP) to the Construction Site of New Sayhun Substation, including Reconstruction of Related Infrastructure Reference No.: REMIT-TJ-CS-QCBS-LS-RS The Republic of Tajikistan has received financing from the World Bank toward the cost of the Regional Electricity Market Interconnectivity and Trade program and intends to use part of these funds for the Consulting Services for the Preparation of Feasibility Study, Environmental and Social documents, Detailed Technical Design, Bills of Quantities (BOQ), Bidding Documents, and Procurement Process Support for the Construction of the 500 kV Transmission Line from Rogun Hydro Power Plant (HPP) to New Sayhun Substation, including new 500/220/35 kV Sayhun-500 Substation, 500 kV Transmission Line Sayhun – Sughd, new 220 kV Outgoing Lines from Sayhun 500 kV substation, new bay at Sughd 500 kV substation, reconstruction of the 220 kV Switchyard at Khujand Substation with the associated 220 kV OHL The main objective of the consulting services is to support the Open Joint Stock Company “Shabakahoi Intiqoli Barq” (SIB) in the preparation of the Feasibility Study development of a Scoping Study and preparation of detailed Environmental and Social Impact Assessment (ESIA), Land Acquisition Plan (LAP)/ Resettlement Action Plan (RAP), Stakeholder Engagement Plan (SEP) and, possibly, Biodiversity Action Plan (BAP), Gender Action Plan (GAP), Detailed Technical Design, Cost Estimates, Bills of Quantities (BOQ), Technical Specifications, Bidding Documents and support during the bidding and evaluation stages of procurement processing. The assignment will be implemented under the following Phases: Phase 1: Preparation of Feasibility Study and ESF Documents for Transmission Line and Substation;Phase 2: Detailed Design and Procurement Support for associated procurement activities;Phase 3: Supervision and contract management during construction, commissioning, and project close-out, extending through the final acceptance and the end of the warranty period. Phase 3 would be implemented under a separate time-based contract to be finalized in case of successful performance of services during Phases 1-2, availability of funds and Client’s decision to engage the Consultant in Phase 3 implementation. Phases 1: Preparation of Feasibility Study and ESF Documents for Transmission Line and Substation Transmission Line - envisages Optimize technical and economic designs through evaluation of alternative routes for 500 kV Rogun-Saihun (lot 1), layouts, and configurations to minimize total project cost, transmission losses, and construction challenges while ensuring compliance with reliability and safety standards. Minimize E&S impacts by avoiding sensitive areas, reducing land acquisition and resettlement, and integrating E&S considerations into technical decisions. Substation - Define the optimal technical concept and preliminary design for the new substation, ensuring reliability, cost-effectiveness, and compliance with modern standards, and prepare key parameters, conceptual layouts, and cost estimates to support the detailed design, and tender document preparation. For reconstruction works, should propose phased implementation strategies to minimize substation shutdowns and ensure operational continuity during construction. Furthermore, the feasibility study should define optimal technical solutions for new equipment within the substation rehabilitation, ensuring high reliability, low latency, data and IT security, and compliance with modern standards. The design should promote sustainability, flexibility, expand-ability, and interoperability with existing systems, using state-of-the-art transmission and control technologies to support reliable, future-proof substation operation. Phase 2: Detailed Design and Procurement Support for associated procurement activities encompasses all activities related to the preparation of the detailed technical design, including the ESMP to be integrated with the Bidding documents, RAP/LRP as required, cost estimation of project packages, Bills of Quantities, Technical Specifications, Bidding Documents, and support during the procurement process, including assistance up to the award of contracts for the transmission line and substation works. The phase I and phase II shall be implemented under a Lump Sum contract. Phase 3: Supervision and contract management during construction, commissioning, and project close-out, extending through the final acceptance and th
Description
REQUEST FOR EXPRESSIONS OF INTEREST REPUBLIC OF TAJIKISTAN Open Joint Stock Company Shabakahoi Intiqoli Barq (SIB) Project: Regional Electricity Market Interconnectivity and Trade program (P509488) Assignment Title: Consulting Services for the Preparation of Feasibility Study, Environmental and Social Documents, Detailed Technical Design, Bills of Quantities (BOQ), Bidding Documents, and Procurement Process Support for the Construction of the 500 kV Transmission Line from Rogun Hydro Power P...
Dates
- Publication
- 21 juillet 2026 à 20 h 00
- Date de clôture
- 30 juillet 2026 à 20 h 00