Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
National Financial Management Consultant
State Committee on Forestry of the Republic of Uzbekistan · International
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- LRP/IC/16
- Organisme émetteur
- State Committee on Forestry of the Republic of Uzbekistan · Voir l'historique des attributions →
- Palier de gouvernement
- international
- Type d’appel d’offres
- Professional & Consulting Services
- Titre
- National Financial Management Consultant
- Source
- World Bank
- Identifiant de la source
- OP00438737
Détails
- Lieu
- International
Résumé
TERMS OF REFERENCE National Individual Consultant — Financial Management RESILAND CA+ Program Uzbekistan Resilient Landscapes Restoration Project (P174135 Contract Type: Individual Consultant — Lump Sum Duration: 3 months with possibility of extension, if needed. 1. BACKGROUND The Uzbekistan Resilient Landscapes Restoration Project (P174135) is financed by the World Bank under the RESILAND CA+ Program (IDA Credit 7138-UZ, PROGREEN Grant TF B7845-UZ, and KWPF Grant TF B7864-UZ), with a total financing of USD 153,000,000. The project is implemented by the Forestry Agency (FA) of the Republic of Uzbekistan through a Project Implementation Unit (PIU), with a project closing date of 15 September 2028. The PIU is at an early stage of establishing its financial management (FM) systems. The Project Operations Manual (POM, November 2023) requires the PIU to adopt IPSAS Cash Basis accounting, install a 1C accounting system within three months of effectiveness, produce quarterly Interim Financial Reports (IFRs), submit annual audited financial statements, and manage disbursements across three separate Designated Accounts. The project also includes a USD 13,000,000 Force Account package under Sub-component 2.1(B), under which leskhozes execute works using their own staff and equipment and must submit monthly Leskhoz Expenditure Reports to the PIU. An assessment of the PIU's current FM capacity indicates the following gaps that must be addressed urgently to meet World Bank fiduciary requirements and avoid delays in disbursement: No adopted Financial Management Manual (FMM) operationalizing the POM's FM chapter FM staff unfamiliar with World Bank SOE, IFR, and DARS formats and preparation procedures 1C accounting system not yet configured for project multi-source accounting (IDA/PROGREEN/KWPF) No IFR or financial reporting templates in use in 1C accounting system. Leskhozes contracted under Sub-component 2.1 Force Account have no guidance on required financial record-keeping or expenditure reporting 2. OBJECTIVE The objective of this assignment is to establish fully functional FM arrangements for the PIU within a three-month period, (with possibility of extension, if needed) leaving the PIU equipped and capable of independently managing all World Bank FM obligations for the remainder of the project. The consultant will produce all required FM instruments, help to configure the accounting system with the 1C provider and integrator, and build the hands-on capacity of the relevant personnel of the PIU and contracted leskhozes through direct training, separately. 3. SCOPE OF WORK AND DELIVERABLES The assignment is organized into five output clusters, each with defined deliverables that form the basis of lump-sum payment. All deliverables must be submitted in English and in Uzbek. No. Months Output Cluster Deliverable Content Standard Payment % D1 1 Financial Management Manual Finalized and PIU Director-approved FMM acceptable to WB covering: accounting standard (IPSAS Cash Basis); chart of accounts (5-segment); internal controls and segregation of duties; DA management procedures for all three instruments; disbursement methods and SOE thresholds; IFR preparation workflow; external audit procedures; sub-grant FM and Force Account leskhoz FM; organization, acceptance, and completion of previous financial years with WB and PIU. Consistent with POM Chapters 4–5, all three DFILs, and World Bank Core Framework no-objection. Bilingual (English/Uzbek). 25% D2 2 Leskhoz FM Orientation Orientation workshop for directors and chief accountants of all leskhozes contracted under Force Account Sub-component 2.1(B), covering: (i) Force Account FM obligations under the contract and FMM Chapter 11; (ii) labor register, equipment log, and materials register maintenance; (iii) LER preparation and submission procedure; (iv) documentation retention requirements; (v) consequences of non-compliance for payment tranches; (vi) review of contracts with leskhozes and development of relevant recommendations, as required by the PIU; (vii) Preparation of a payment schedule for the repayment of outstanding funds under contracts with leskhozes. Workshop materials (slide deck, quick-reference guide) delivered in Uzbek Attendance records and workshop report submitted. All contracted leskhoz directors and chief accountants attend. Quick-reference guide distributed and confirmed received. 25% D3 Accounting System Configuration Verification of the installed 1-C system for compliance with World Bank requirements, implementing necessary adjustments, and reconciling it based on previous fiscal years (covering Leskhozes’ contract management and all other signed co
Description
TERMS OF REFERENCE National Individual Consultant — Financial Management RESILAND CA+ Program Uzbekistan Resilient Landscapes Restoration Project (P174135 Contract Type: Individual Consultant — Lump Sum Duration: 3 months with possibility of extension, if needed. 1. BACKGROUND The Uzbekistan Resilient Landscapes Restoration Project (P174135) is financed by the World Bank under the RESILAND CA+ Program (IDA Credit 7138-UZ, PROGREEN Grant TF B7845-UZ, and KWPF Grant TF B7864-UZ), with a tot...
Dates
- Publication
- 14 avril 2026 à 20 h 00
- Date de clôture
- 21 avril 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: World Bank
Dernière modification : 2026-09-09 21 h 03 min 59 s
Actualisation toutes les 2 heures