Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Arlington Street - Asphalt Reconstruction McPhillips Street - Mill and Fill
The City of Winnipeg · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000315497
- Organisme émetteur
- The City of Winnipeg · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Arlington Street - Asphalt Reconstruction McPhillips Street - Mill and Fill
- Source
- MERX Manitoba
- Identifiant de la source
- 0000315497
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Federally and Provincially Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue (b) Sewer Repairs and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue Part 2 – Federally and Provincially Funded Work D2.3 Part 2 – Federally and Provincially Funded Work shall consist of: (a) Asphalt Mill and Fill and Associated Works (i) McPhillips Avenue from Emes Road to North Point Boulevard D2.4 The major components of the Work are as follows: (a) Asphalt Reconstruction and Associated Works (i) Abandon existing catch basins and drainage inlets; (ii) Installation of catch basins and sewer service pipes; (iii) Installation of manhole; (iv) Installation of new 300mm combined sewer; (v) Removal of existing sidewalk; (vi) Removal of existing curb as required; (vii) Renewal of existing concrete sidewalk as required; (viii) Removal of existing pavement; (ix) Excavation; (x) Compaction of existing sub-grade; (xi) Placement of wicking geogrid composite (E20); (xii) Insulation of water mains; (xiii) Installation of sub drains; (xiv) Placement and compaction of sub-base material; (xv) Placement and compaction of base course material; (xvi) Construction of 150mm concrete pavement (reinforced); (xvii) Construction of barrier curb and reversed gutter for asphalt pavement (SD-200B), utilizing slip-form paving equipment; (xviii) Construction of barrier curb for asphalt pavement (SD-200A); (xix) Construction of modified barrier curb for asphalt pavement (SD-203C); (xx) Construction of lip curb for asphalt pavement (SD-202E); (xxi) Construction of curb ramp for asphalt pavement (SD-229F); (xxii) Renewal of existing curb as required; (xxiii) Placement and compaction of suitable site material as backfill behind barrier curb and reversed gutter; (xxiv) Placement and compaction of 50mm granular B behind barrier curb and modified barrier curb for asphalt pavements; (xxv) Grading of boulevards; (xxvi) Placement and compaction of topsoil; (xxvii) Placement of asphalt pavement (Type MS2, 60mm thickness); (xxviii) Installation of pavement repair fabric at gutter inlets and manholes (SD-220E and SD-220G); (xxix) Placement of asphalt pavement (Type MS1, 50mm thickness); (xxx) Placement of asphalt pavement tie-ins (Type MS2 and MS1); and (xxxi) Placement of sod. (b) Sewer Repairs and Associated Works (i) Pre-construction sewer and sewer service video inspection; (ii) External point repair of existing sewer main; (iii) Sewer service reconnection; (iv) Install new manhole and connect to existing sewer; (v) Post construction sewer and sewer service video inspection. (c) Asphalt Mill and Fill and Associated Works (i) Asphalt pavement removal; (ii) Re-grading existing ditch and side slopes; (iii) Excavation; (iv) Sub-grade compaction; (v) Placement of geotextile fabric; (vi) Preparation of existing shoulder; (vii) Placement and compaction of sub-base material; (viii) Placement of geogrid; (ix) Placement and compaction of base course material; (x) Milling existing asphalt pavement (1-50mm); (xi) Full depth concrete repairs of existing slabs and joints (200mm reinforced); (xii) Asphalt patching; (xiii) Renewal of existing curb as required; (xiv) Renewal of existing concrete bull-nose; (xv) Construction of 150mm concrete pavement (reinforced); (xvi) Construction of modified barrier curb; (xvii) Grading of boulevards; (xviii) Placement of asphalt pavement (Type MS1); (xix) Placement and compaction of topsoil; and (xx) Hydroseeding See more
Description
Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Federally and Provincially Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue (b) Sewer Repairs and Associated Works (i) Arlington Street from Inkster Boulevard to Enniskillen Avenue Part 2 – Federally an...
Dates
- Publication
- 24 février 2026 à 19 h 00
- Date de clôture
- 10 mars 2026 à 20 h 00
Classification
Catégorie normalisée
Source: MERX Manitoba
Dernière modification : 2026-09-02 12 h 08 min 52 s
Actualisation toutes les 2 heures