Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AB-2026-05750 (90 St Stormwater Culvet Repair)

90th Street Outfall Repair & Pedestrian Crossing

Town of Peace River · Peace River, Alberta, Canada

Cet appel d’offres a fermé le 26 août 2026 à 10 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureMunicipal

Renseignements généraux

Numéro de référence
AB-2026-05750 (90 St Stormwater Culvet Repair)
Palier de gouvernement
Municipal
Type d’appel d’offres
Construction & Infrastructure
Titre
90th Street Outfall Repair & Pedestrian Crossing
Identifiant de la source
AB-2026-05750

Détails

Lieu
Peace River, Alberta, Canada

Résumé

Roadwork and grading on 90th Street, Town of Peace River, including removal of the existing culvert, installation of twin HDPE pipes, cable concrete armoring, granular base and asphalt concrete pavement, and installation of pedestrian crossing beacon and signage. Safety pre-qualification is required. The successful Contractor will be required to enter into a Local Road Use Agreement with the Town of Peace River. Alberta Environment approval is required prior to commencement of construction; application has been submitted and approval is pending. Traffic accommodation, environmental controls, utility coordination, and applicable insurance requirements apply. Commodity: Drainage services, Highway and road construction services, Highway and road sign or guardrail construction and repair service, Infrastructure building and surfacing and paving services, Highway and road paving service, Pipe laying service

Description

Roadwork and grading on 90th Street, Town of Peace River, including removal of the existing culvert, installation of twin HDPE pipes, cable concrete armoring, granular base and asphalt concrete pavement, and installation of pedestrian crossing beacon and signage. Safety pre-qualification is required. The successful Contractor will be required to enter into a Local Road Use Agreement with the Town of Peace River. Alberta Environment approval is required prior to commencement of construction; app...

Dates

Publication
14 août 2026 à 19 h 20
Date de clôture
26 août 2026 à 10 h 00

Comment soumissionner

Classification

Catégories NIBS

701718007214100072141002721411007214110372141124

Catégorie normalisée

Construction & Infrastructure

Source: Alberta Purchasing

Dernière modification : 2026-09-09 20 h 56 min 48 s

Actualisation toutes les 2 heures