75N99019F00060

IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL

National Institutes of Health · États-Unis

Ce contrat a été attribué. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Attribué

AttribuéConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
75N99019F00060
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL
Identifiant de la source
usa-75N99019F00060

Détails

Lieu
États-Unis

Résumé

IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL CONSTRUCTION DOCUMENTS. $1,164,040.42 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF DECEMBER 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 3: POST DESIGN CONSTRUCTION ADMINISTRATION. $986,876.76 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 4: CONSTRUCTION INSPECTION SERVICES $265,310.86 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 5: DEVELOP PLAN FOR MOVEMENT OF USERS IN EXISTING BUILDING 40 TO RELOCATED TO 40A. PROVIDE DESIGN OF RENOVATIONS FOR THIS FACILITY ASSUMING EXISTING INFRASTRUCTURE WILL NOT REQUIRE FULL DESIGN BUT MINOR LAB RENOVATIONS TO OCCUR TO 25% OF SPACE. THESE DESIGN ACTIVITIES ARE ENVISIONED TO OCCUR DURING THE CONSTRUCTION OF THE 40A TOWER. $354,684.12 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF JUNE 1, 2021. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: TASK: 03/22/2019 - 05/22/2022 ORDER: 03/22/2019 - 10/30/2022 PRICE: BASE: $1,963,040.00 OPTION 1: $1,161,010.41 ACCEPTED, EXERCISE BY 2/1/2020 OPTION 2: $1,164,040.42 ACCEPTED, EXERCISE BY 12/1/2020 OPTION 3: $986,876.76 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 4: $265,310.86 ACCEPTED, EXERCISE BY 6/1/2021 OPTION 5: $354,684.12 ACCEPTED, EXERCISE BY 6/1/2021 DELIVER TO: NIH CAMPUS, BLDG. 40 PRODUCT SERVICE CODE: C219 PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- GENERAL: OTHER CAN # 8037135, ORF TAS::75 9/3 0838::TAS 08023820195DB0 DUNS # 07876328 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. Awarded to: AECOM SMITH CARTER JOINT VENTURE Agency: Department of Health and Human Services Sub-agency: National Institutes of Health Award type: DELIVERY ORDER

Description

IGF::OT::IGF - ("OTHER FUNCTIONS") C103754 - DESIGN SERVICES FOR BUILDING 40 NORTH TOWER PROJECT, VRC LABORATORY EXPANSION BLDG; NIH, BETHESDA, MD - STEPHANIE HIXSON THE WORK DESCRIBED IN THIS TASK ORDER INCLUDE THE FOLLOWING: BASE: SCHEMATIC DESIGN TO 35% $1,963,040.00 OPTION 1: 65% DESIGN DEVELOPMENT DOCUMENTS. $1,161,010.41 THIS OPTION IS ACCEPTED WITH AN EXERCISE DATE OF FEBRUARY 1, 2020. IT WILL NOT BE AWARDED WITH BASE BUT WILL BE PLACED AS AN OPTION IN CONTRACT. OPTION 2: 100%, FINAL CONS...

Dates

Publication
20 mars 2019 à 20 h 00
Date de clôture
30 mars 2027 à 20 h 00

Valeur estimée

$16.9M USD

Classification

Catégorie normalisée

Construction & Infrastructure

Source: USASpending (Federal)