Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
LR-LEC-539960-CS-CQS

Consulting Services for Preparation of an Environmental and Social Impact Assessment for Saint Paul 2 Hydropower Project Early Construction Works

Liberia Electricity Corporation · International

Cet appel d’offres a fermé le 12 avril 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméServices professionnels et de consultationinternational

Renseignements généraux

Numéro de référence
LR-LEC-539960-CS-CQS
Palier de gouvernement
international
Type d’appel d’offres
Professional & Consulting Services
Titre
Consulting Services for Preparation of an Environmental and Social Impact Assessment for Saint Paul 2 Hydropower Project Early Construction Works
Identifiant de la source
OP00434716

Détails

Lieu
International

Résumé

LIBERIA ELECTRICITY CORPORATION PROJECT: SAINT PAUL 2 HYDROPOWER PROJECT REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services for Preparation of an Environmental and Social Impact Assessment for Saint Paul 2 Hydropower Project Early Construction Works Project ID No.: P513900 Reference No.: LR-LEC-539960-CS-CQS Closing Date: April 13, 2026 Background The Liberia Electricity Corporation (LEC) has secured financing from the World Bank under the Saint Paul 2 Hydropower Project. Part of the proceeds will be applied to consulting services for preparation of the Environmental and Social Impact Assessment (ESIA), Environmental and Social Management Plan (ESMP), and associated instruments for Phase 1 Early Construction Works. The objective is to obtain EPA approval and World Bank “No Objection” to enable timely commencement of Phase 1 works. The scope is divided into two packages: (i) Resettlement aspects, and (ii) general ESIA/ESMP development. Key tasks include: Describe early construction works and alternatives considered. Review baseline studies and conduct consultations, including measures for vulnerable groups. Identify environmental and social risks and impacts (excluding resettlement). Propose mitigation measures and prepare ESIA, ESMP, and contractor ESHS requirements in line with Liberia EPA and World Bank ESF standards. The consultant will report to the RESPITE PIU E&S Early Works Deputy Manager, with deliverables submitted electronically to the PIU and copied to the E&S Deputy Manager, E &S Manager Project Director . The duration of the assignment is six months. The detailed Terms of Reference (TOR) for the assignment can be obtained at the following link: https://lecliberia.com/wp-content/uploads/20260324-ToR_for_SP2_EWs-ESIA-Cleaared.docx The Liberia Electricity Corporation (LEC) now invites eligible consulting firms (“Consultants”) to express their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: Core business and years in business: The firm shall be registered/ incorporated as a consulting firm with core business in the field of the assignment. Qualification and Experience of the Firm: The firm selected to undertake this assignment must hold certification with Liberia EPA or be able to provide it timeously Must have successfully completed three ESIAs within the past five years One of the assignments must have been for a road upgrade/construction project in West Africa, of at least 20km in length), preferably hydropower related with at least one assignment associated with a World Bank funded project prepared in accordance with ESF requirements. A main consultant/ sub consultant arrangement or a joint venture between a local or regional firm and an international E&S consulting firm is encouraged for improved capacity to meet ESF requirements. In addition, for international consultants it is a requirement by the EPA to partner with a local EPA certified consultancy firm. Technical and managerial capability of the firm: Proven project management structure with clear roles and reporting lines. Possession of adequate, qualified and experienced key personnel and logistic resources to carry out the assignment Ability to partner effectively with Liberia EPA‑certified local firms. Established quality assurance and compliance systems aligned with Liberia EPA and World Bank ESF requirements. Strong stakeholder engagement and grievance redress mechanisms. Capacity for baseline data collection, impact assessment, and secure database management. Demonstrated ability to deliver ESIA/ESMP assignments on time and within budget. Note: Key Experts will not be evaluated at the shortlisting stage. The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” (Seventh Edition, September 2025), setting forth the World Bank’s policy on conflict of interest. Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract. A consulting firm will be selected in accordance with the Consultant Qualifications-based Selection (CQS) method set out in the Procurement Regulations. Further information can be obtained at the address below during office hours from 0900 to 1600 hours GMT. Expressions of interest must be delivered on or before April 13, 2026, at 23.59 hrs. local time. Electronic submissions should mention the subject message: Consulting Services for Preparation of an Environmental and Social Impact Assessment for Saint Paul 2 Hydropower Project Early Co

Description

LIBERIA ELECTRICITY CORPORATION PROJECT: SAINT PAUL 2 HYDROPOWER PROJECT REQUEST FOR EXPRESSIONS OF INTEREST Consulting Services for Preparation of an Environmental and Social Impact Assessment for Saint Paul 2 Hydropower Project Early Construction Works Project ID No.: P513900 Reference No.: LR-LEC-539960-CS-CQS Closing Date: April 13, 2026 Background The Liberia Electricity Corporation (LEC) has secured financing from the World Bank under the Saint Paul 2 Hydropower Project. Part of th...

Dates

Publication
24 mars 2026 à 20 h 00
Date de clôture
12 avril 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Professional & Consulting Services

Source: World Bank

Dernière modification : 2026-09-09 20 h 57 min 40 s