Millennium Library Structural Rehabilitation 251 Donald Street
The City of Winnipeg · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000334416
- Organisme émetteur
- The City of Winnipeg · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Millennium Library Structural Rehabilitation 251 Donald Street
- Source
- MERX Manitoba
- Identifiant de la source
- 0000334416
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Description Full Title: Millennium Library Structural Rehabilitation 251 Donald Street, Winnipeg, Manitoba See B8 for Proponent Conference. B6. SCOPE OF WORK B6.1 The Work to be done under the subsequent Contract shall consist of the structural rehabilitation to the Millennium Library Parkade including associated architectural, mechanical and electrical work as further detailed below. (a) The parkade will remain open for the duration of the rehabilitation. The current design includes segregating the parkade rehabilitation into seven (7) phases. Each phase including both P1 and P2 levels at the same time will be turned over to the Contractor. The remainder of the parkade will remain open for public access and parking. Phases including ramps will require the Contractor to develop and maintain traffic plans for two- way traffic on ramps designed for one way operation. B6.2 The major components of the Work are as follows: (a) General Requirements: (i) General coordination, management, supervision and administration as typically assigned responsibilities of a General Contractor of the project as a General Contractor either self performing and/or retaining subcontractors for the work outlined below. (ii) Contractors self-performing and subcontractors retained to complete work outlined below shall meet qualification requirements specified in the Tender for the project. Prior to award of the Tender, the successful Bidder shall provide evidence that contractors self-performing, and subcontractors meet the qualification requirements specified in the Tender. Bids from Bidders including Contractors self-performing and subcontractors found not to meet the qualifications specified in the Tender shall be rejected. (iii) Prime Contractor as defined by workplace safety and health legislation. (iv) Segregation of construction areas from publicly occupied areas of the facility. (v) Traffic control: The Contractor shall be responsible to develop, implement and maintain a traffic control program, acceptable to the City to allow continued public use of the parkade during construction following the phasing identified in the Tender. Including methods to control two-way traffic on ramps designed for one direction operation. (vi) Asbestos abatement: The Contractor shall be responsible for asbestos abatement in accordance with specifications included in the Tender. Air monitoring will be completed by the City. The Contractor shall be responsible for the coordination of work and asbestos abatement. The Contractor shall also be responsible for coordination of associated inspection and air monitoring with the City’s asbestos abatement consultant including but not limited to clearances, stop-work authority, and re-entry requirements following abatement. (vii) Removal, salvage and reinstallation of existing fixtures such as bike parking fences and racks, vehicle wash equipment, and signs and barricades. (b) Site Protection Plan: The Work includes demolition and structural rehabilitation within a publicly occupied facility. The nature of the work requires careful coordination of activities to protect the public and remaining areas of the facility. The Contractor shall develop and implement a Site Protection plan which includes seven components further detailed below. (i) Site protection plan, (ii) Fire protection plan, (iii) Dust protection plan, (iv) Water, slurry and debris management plan, (v) Emergency egress plan, (vi) Temporary ventilation plan, and (vii) Contractor site access plan. (c) Site Protection Plan – Phasing plan compound areas: In conjunction with the phasing shown on construction Drawings, the Contractor shall be responsible to design and submit for coordination a phasing plan outlining the following both overall and within each phase area: (i) Extents of hoarding walls, (ii) Extents of contract work, (iii) Locations of storage and lay-down areas, (iv) Location of site office, (v) Location of sanitary facilities, Location of hydro demolition equipment, and (vi) Route water lines from hydro demolition equipment and work area. (d) Site Protection Plan – Fire protection plan: In conjunction with the phasing shown on construction Drawings, the Contractor shall be responsible to design and submit for coordination a fire protection plan outlining the following to maintain fire protection both overall and within each phase area: (i) Alterations to the existing building fire protection systems to maintain fire protection both within active construction phase areas and publicly occupied areas, (ii) Locations of fire hose cabinets, (iii) Locations of fire extinguishers, (iv) Locations of fire-rated wall assemblies, and (v) Development of a fire watch procedure compliant with legislation where fire protection systems will be deactivated for the Work. (e) Site Protection Plan –
Description
Description Full Title: Millennium Library Structural Rehabilitation 251 Donald Street, Winnipeg, Manitoba See B8 for Proponent Conference. B6. SCOPE OF WORK B6.1 The Work to be done under the subsequent Contract shall consist of the structural rehabilitation to the Millennium Library Parkade including associated architectural, mechanical and electrical work as further detailed below. (a) The parkade will remain open for the duration of the rehabilitation. The current design includes segregating...
Dates
- Publication
- 12 octobre 2026 à 20 h 00
- Date de clôture
- 12 novembre 2026 à 19 h 00
Classification
Catégorie normalisée
Source: MERX Manitoba