Alternative Active Effluent Discharge Line Installation Works and Final Design

Nuclear Restoration Services · Royaume-Uni

Ce contrat a été attribué. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Attribué

AttribuéConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
CF-0304300D4L000000iAvzUAE
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
Alternative Active Effluent Discharge Line Installation Works and Final Design
Identifiant de la source
21f8629d-c739-4679-bc17-65fd0dbaf55e-920742

Détails

Lieu
Royaume-Uni

Résumé

The Cooling water system at NRS Hunterston B site is no longer required for any cooling function. Therefore, the intention is to remove the Cooling Water pumps and there is a requirement to provide Alternative Active Effluent Discharge Lines (AAEDL) to the sea discharge point. This contract is for final concept design services and the marine installation of new pipe, valve and other minor works for the AAEDL seaward side, at the Hunterston B Nuclear site. This is to include: - End of line isolation and backflow protection - Culvert fixings - Pipe fitting and valve repair/replacement/installation - Pressure testing and maintenance strategy - Any required pre-works The Contract has been awarded via Mini-Competition under the NRS Decommissioning and Asbestos Removal (DAR) Framework Lot 1 - conventional deplanting, asbestos removal and demolition.

Description

The Cooling water system at NRS Hunterston B site is no longer required for any cooling function. Therefore, the intention is to remove the Cooling Water pumps and there is a requirement to provide Alternative Active Effluent Discharge Lines (AAEDL) to the sea discharge point. This contract is for final concept design services and the marine installation of new pipe, valve and other minor works for the AAEDL seaward side, at the Hunterston B Nuclear site. This is to include: - End of line isol...

Dates

Publication
5 novembre 2026 à 10 h 32
Date de clôture
18 août 2026 à 07 h 00

Valeur estimée

$9.5M GBP