Plan No.: 024126 RED DEER - RED DEER JUSTICE CENTRE - Post-Occupancy - Bollard Remediation Project
Infrastructure · Alberta, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- AB-2026-01608 (Plan No.: 024126)
- Organisme émetteur
- Infrastructure · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Plan No.: 024126 RED DEER - RED DEER JUSTICE CENTRE - Post-Occupancy - Bollard Remediation Project
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-01608
Détails
- Lieu
- Alberta, Canada
Résumé
Work of this Contract comprises the following: .1 Main Parkade: relocate HPU off exit ramp wall to adjacent loading dock location. Place HPU on new concrete housekeeping pad. Install bollards as noted on structural drawings. Remove existing steel support for HPU once moved. Reconnect all mechanical and electrical for HPU in new location. This includes coring through existing wall. Investigate and troubleshoot cause of non-operational HPU. Use cash allowance for supply and replacement of failed components in original equipment & return to full functionality, as noted in Section 0041 14. Adjust programming in equipment to allow operation of overhead doors separate from bollards as noted in M&E drawings. .2 Sally Port Parkade (Entrance and Exit)– relocate controller for HPU down to ground level and modify electrical/mechanical so screen is operational at lower level. Adjust programming in equipment to allow operation of overhead doors separate from bollards as noted in M&E drawings. Commodity: Power Generation and Distribution Machinery and Accessories, Power sources, Structures and Building and Construction and Manufacturing Components and Supplies, Permanent structures, Building and Facility Construction and Maintenance Services, Building and facility maintenance and repair services, General building construction
Description
Work of this Contract comprises the following: .1 Main Parkade: relocate HPU off exit ramp wall to adjacent loading dock location. Place HPU on new concrete housekeeping pad. Install bollards as noted on structural drawings. Remove existing steel support for HPU once moved. Reconnect all mechanical and electrical for HPU in new location. This includes coring through existing wall. Investigate and troubleshoot cause of non-operational HPU. Use cash allowance for supply and replacement of failed c...
Dates
- Publication
- 25 février 2026 à 07 h 07
- Date de clôture
- 10 mars 2026 à 10 h 00
Comment soumissionner