Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
RM159-26-08

Supply and Application of Soil Stabilization and Granular Seal Coat - Tower Road & Inland Drive

Rural Municipality of Sherwood No. 159 · Saskatchewan, Canada

Cet appel d’offres a fermé le 25 juin 2026 à 10 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméAutreProvincial

Renseignements généraux

Numéro de référence
RM159-26-08
Palier de gouvernement
Provincial
Type d’appel d’offres
Other
Titre
Supply and Application of Soil Stabilization and Granular Seal Coat - Tower Road & Inland Drive
Identifiant de la source
95153c5c-aaa6-4d84-8c50-428db39e3990

Détails

Lieu
Saskatchewan, Canada

Résumé

Description of the Work: SUPPLY AND APPLICATION SOIL STABILIZER AND GRANULAR SEAL COAT on Tower Road and Inland Drive; for a TOTAL DISTANCE OF 4.58 km. The proposal is to supply and install soil stabilizer and granular seal coat, necessary equipment and manpower to complete the installation to a depth of 200mm (8”). The proposal is based on the road top at approximately 10 m and the work would include:Ripping the road surface approximately 8”Supply and install the soil stabilizer into the 8” SUBGRADERe-lay and compact material to 100% densityPlace gravel (supplied by owner)Sample and test for moisture and density to be completed by contractorSupply and install the granular seal coat Bid Closing Location, Date and Time: Sealed bids must be submitted to the RM of Sherwood No. 159 at 4400 Campbell St. Regina, Saskatchewan S4W 0L3 by 2:00 P.M. C.S.T. on June 25, 2026.

Description

Description of the Work: SUPPLY AND APPLICATION SOIL STABILIZER AND GRANULAR SEAL COAT on Tower Road and Inland Drive; for a TOTAL DISTANCE OF 4.58 km. The proposal is to supply and install soil stabilizer and granular seal coat, necessary equipment and manpower to complete the installation to a depth of 200mm (8”). The proposal is based on the road top at approximately 10 m and the work would include:Ripping the road surface approximately 8”Supply and install the soil stabilizer into the 8” SUB...

Dates

Publication
3 juin 2026 à 12 h 00
Date de clôture
25 juin 2026 à 10 h 00

Documents

Comment soumissionner

Classification

Catégorie normalisée

Other

Source: SaskTenders

Dernière modification : 2026-09-09 20 h 58 min 00 s

Actualisation toutes les 2 heures