Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
0000318771

Professional Consulting Services for Ash Flood Pumping Station

The City of Winnipeg · Winnipeg, Manitoba, Canada

Cet appel d’offres a fermé le 21 avril 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000318771
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Professional Consulting Services for Ash Flood Pumping Station
Identifiant de la source
0000318771

Détails

Lieu
Winnipeg, Manitoba, Canada

Résumé

Description Full Title: Professional Consulting Services for Ash Flood Pumping Station 2027/2028 Rehabilitation D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of the following: (a) Preliminary Engineering Design (D6); (b) Detailed Engineering Design (D7); (c) Contract Document Preparation (D8); (d) Procurement Process (D9); (e) PLC & HMI Controller Programming (D10); (f) Contract Administration Services – Non-Resident (D11); (g) Contract Administration Services – Resident (D12); (h) Commissioning (D13); (i) Record Documents and Project Closeout (D14); and (j) Additional Work Allowance (D15). D4.1.1 The Services required under D4.1 shall be in accordance with the City’s Project Management Manual https://winnipeg.ca/infrastructure/asset-management- program/templates-manuals.stm#3 and templates http://winnipeg.ca/infrastructure/asset- management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Consulting Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. Where the Services required include Contract Administration, Consultants shall pay particular attention to the revisions to Section 9.19 and 9.20.1 of the City’s Project Management Manual in Addendum #8. https://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#3 D4.2 The following shall apply to the Services: (a) The City of Winnipeg, Water and Waste Department - Electrical Design Guide, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (b) The City of Winnipeg, Water and Waste Department - Automation Design Guide, current revision: 03 attached as Appendix C. (c) The City of Winnipeg, Water and Waste Department – Identification Standard, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (d) The City of Winnipeg, Water and Waste Department – HMI Layout and Animation Plan, current revision: 02 attached as Appendix D. (e) The City of Winnipeg, Water and Waste Department – Tag Naming Standard, current revision: 00 attached as Appendix G. (f) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989 (g) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604 (h) Should this project include a public engagement aspect, it will be required to meet: Public Engagement Guidelines https://winnipeg.ca/PublicEngagement/pdfs/PublicEngagementRequirements.pdf D4.3 The City of Winnipeg has adopted Manitoba Building Code (2024 edition), which adopts National Building Code (2020 edition). All designs shall comply with the latest building code editions. D4.4 All electrical work shall comply with latest version of Manitoba Electrical Code along with Canadian Electrical Code (2024 edition). D4.5 Latest available editions of NFPA 820 along with CSA B149.1 shall be followed for the project even if they have not been adopted by the City of Winnipeg. D4.6 The funds available for this Contract are $260,000.00 See more

Description

Description Full Title: Professional Consulting Services for Ash Flood Pumping Station 2027/2028 Rehabilitation D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of the following: (a) Preliminary Engineering Design (D6); (b) Detailed Engineering Design (D7); (c) Contract Document Preparation (D8); (d) Procurement Process (D9); (e) PLC & HMI Controller Programming (D10); (f) Contract Administration Services – Non-Resident (D11); (g) Contract Administration Service...

Dates

Publication
29 mars 2026 à 20 h 00
Date de clôture
21 avril 2026 à 20 h 00

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-09-09 20 h 58 min 12 s

Actualisation toutes les 2 heures