Professional Consulting Services for Ash Flood Pumping Station
The City of Winnipeg · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000318771
- Organisme émetteur
- The City of Winnipeg · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Professional Consulting Services for Ash Flood Pumping Station
- Source
- MERX Manitoba
- Identifiant de la source
- 0000318771
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Description Full Title: Professional Consulting Services for Ash Flood Pumping Station 2027/2028 Rehabilitation D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of the following: (a) Preliminary Engineering Design (D6); (b) Detailed Engineering Design (D7); (c) Contract Document Preparation (D8); (d) Procurement Process (D9); (e) PLC & HMI Controller Programming (D10); (f) Contract Administration Services – Non-Resident (D11); (g) Contract Administration Services – Resident (D12); (h) Commissioning (D13); (i) Record Documents and Project Closeout (D14); and (j) Additional Work Allowance (D15). D4.1.1 The Services required under D4.1 shall be in accordance with the City’s Project Management Manual https://winnipeg.ca/infrastructure/asset-management- program/templates-manuals.stm#3 and templates http://winnipeg.ca/infrastructure/asset- management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Consulting Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. Where the Services required include Contract Administration, Consultants shall pay particular attention to the revisions to Section 9.19 and 9.20.1 of the City’s Project Management Manual in Addendum #8. https://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#3 D4.2 The following shall apply to the Services: (a) The City of Winnipeg, Water and Waste Department - Electrical Design Guide, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (b) The City of Winnipeg, Water and Waste Department - Automation Design Guide, current revision: 03 attached as Appendix C. (c) The City of Winnipeg, Water and Waste Department – Identification Standard, current revision: https://winnipeg.ca/waterandwaste/dept/manual.stm#wastewater (d) The City of Winnipeg, Water and Waste Department – HMI Layout and Animation Plan, current revision: 02 attached as Appendix D. (e) The City of Winnipeg, Water and Waste Department – Tag Naming Standard, current revision: 00 attached as Appendix G. (f) City of Winnipeg Green Building Policy: New City-Owned Buildings and major additions http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=5989 (g) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604 (h) Should this project include a public engagement aspect, it will be required to meet: Public Engagement Guidelines https://winnipeg.ca/PublicEngagement/pdfs/PublicEngagementRequirements.pdf D4.3 The City of Winnipeg has adopted Manitoba Building Code (2024 edition), which adopts National Building Code (2020 edition). All designs shall comply with the latest building code editions. D4.4 All electrical work shall comply with latest version of Manitoba Electrical Code along with Canadian Electrical Code (2024 edition). D4.5 Latest available editions of NFPA 820 along with CSA B149.1 shall be followed for the project even if they have not been adopted by the City of Winnipeg. D4.6 The funds available for this Contract are $260,000.00 See more
Description
Description Full Title: Professional Consulting Services for Ash Flood Pumping Station 2027/2028 Rehabilitation D4. SCOPE OF SERVICES D4.1 The Services required under this Contract shall consist of the following: (a) Preliminary Engineering Design (D6); (b) Detailed Engineering Design (D7); (c) Contract Document Preparation (D8); (d) Procurement Process (D9); (e) PLC & HMI Controller Programming (D10); (f) Contract Administration Services – Non-Resident (D11); (g) Contract Administration Service...
Dates
- Publication
- 29 mars 2026 à 20 h 00
- Date de clôture
- 21 avril 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: MERX Manitoba
Dernière modification : 2026-09-09 20 h 58 min 12 s
Actualisation toutes les 2 heures