Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
NSOMS001-DN691619-98257262

MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge)

North Somerset Council · Royaume-Uni

Ce contrat a été attribué. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Attribué

AttribuéConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
NSOMS001-DN691619-98257262
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 1 (Marsh Lane Bridge)
Identifiant de la source
f6739d95-c1ea-4ff0-9d02-16d735ac39c9-896355

Détails

Lieu
Royaume-Uni

Résumé

North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project. The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhancements to the local rail network. The highway and bridge works comprise of two works packages. Package 1 is the highways scope which includes detailed design (stage 1) and construction (stage 2). Package 2 is the bridges scope which includes stage 2 construction only (covered by 3 separate contracts). This notice relates to the award of the Stage 2 Package 2 Bridges construction contract 1 of 3 (Marsh Lane Bridge).

Description

North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project. The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhan...

Dates

Publication
7 mai 2026 à 12 h 48
Date de clôture
13 décembre 2023 à 08 h 00

Valeur estimée

$312K GBP

Classification

Catégorie normalisée

Construction & Infrastructure

Source: Contracts Finder (UK)

Dernière modification : 2026-05-25 14 h 37 min 29 s