Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
M6 Lune Gorge - Water Monitoring/Sampling
KIER TRANSPORTATION LIMITED · Royaume-Uni
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- M6 Lune Gorge - Water Monitoring/Sampling
- Organisme émetteur
- KIER TRANSPORTATION LIMITED · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Healthcare & Medical
- Titre
- M6 Lune Gorge - Water Monitoring/Sampling
- Source
- Contracts Finder (UK)
- Identifiant de la source
- f488c51c-688b-4025-8b93-67ce334daab6-886673
Détails
- Lieu
- Royaume-Uni
Résumé
Kier Transportation are looking to engage experienced and qualified contractors to provide water monitoring and sampling requirements on 10 designated points as specified on the M6 Lune Gorge project. Frequency: Monthly - requirement for company awarded tender to attend site monthly to collect samples. Monitoring requirements: The following parameters shall be laboratory tested for monthly - pH - electrical conductivity - total suspended solids - dissolved oxygen - turbidity - redox potential - bicarbonate alkalinity - total and dissolved organic carbon - metal suite (dissolved and totals): aluminium, arsenic, cadmium, copper, lead, zinc - major ions: calcium, chloride, sulphate, potassium, sodium - nitrate - phosphate - Total Petroleum Hydrocarbons (TPH) (speciated, aliphatic and aromatic split) - Polycyclic Aromatic Hydrocarbons (16 PAHs) We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Description
Kier Transportation are looking to engage experienced and qualified contractors to provide water monitoring and sampling requirements on 10 designated points as specified on the M6 Lune Gorge project. Frequency: Monthly - requirement for company awarded tender to attend site monthly to collect samples. Monitoring requirements: The following parameters shall be laboratory tested for monthly - pH - electrical conductivity - total suspended solids - dissolved oxygen - turbidity - redox potential ...
Dates
- Publication
- 3 mars 2026 à 02 h 01
- Date de clôture
- 9 mars 2026 à 13 h 00
Valeur estimée
$100K GBP
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-05-25 14 h 37 min 32 s
Actualisation toutes les 2 heures