Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Stage 2 - Roadside Ditching - Trans-Canada Highway - Field Hill, Yoho National Park
Parks Canada Agency (PC) · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 5P468-26-0097/A
- Organisme émetteur
- Parks Canada Agency (PC) · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Stage 2 - Roadside Ditching - Trans-Canada Highway - Field Hill, Yoho National Park
- Source
- CanadaBuys
- Identifiant de la source
- 5P468-26-0097/A
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Parks Canada Agency (PCA) has a requirement for a Contractor to complete the drainage ditch maintenance along the two-lane section of the Trans-Canada Highway known as Field Hill, located just east of Field, British Columbia, within Yoho National Park. The Contractor is responsible for removing debris and obstructions that impede the natural flow of water in roadside drainage ditches and for reshaping existing roadside, interceptor, and take-off drainage ditches. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid. Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business”.
Description
Parks Canada Agency (PCA) has a requirement for a Contractor to complete the drainage ditch maintenance along the two-lane section of the Trans-Canada Highway known as Field Hill, located just east of Field, British Columbia, within Yoho National Park. The Contractor is responsible for removing debris and obstructions that impede the natural flow of water in roadside drainage ditches and for reshaping existing roadside, interceptor, and take-off drainage ditches. TWO STAGE SELECTION PROCESS Th...
Dates
- Publication
- 5 août 2026 à 20 h 00
- Date de clôture
- 25 août 2026 à 12 h 00
Comment soumissionner
Classification
Catégories UNSPSC
Catégorie normalisée
Source: CanadaBuys
Dernière modification : 2026-09-09 20 h 58 min 22 s
Actualisation toutes les 2 heures