Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
HWY-B26114

Roadwork-Construction of Short Span Bridges on HWYs 905 & 919, CS: 905-02, 919-02

Highways · Saskatchewan, Canada

Cet appel d’offres a fermé le 3 novembre 2026 à 09 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
HWY-B26114
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Roadwork-Construction of Short Span Bridges on HWYs 905 & 919, CS: 905-02, 919-02
Identifiant de la source
d646991e-243c-49a8-9104-d3b0c72fd7b1

Détails

Lieu
Saskatchewan, Canada

Résumé

CONSTRUCTION OF SHORT SPAN BRIDGE on Highway No. 905 over Wathaman River approximately 103 km north of junction with Highway No. 102, and on Highway No. 919 over Martineau River approximately 53.3 km north of Pierceland, Saskatchewan. The existing bridge will be dismantled, and a new bridge will be constructed on Highway No. 905 over Wathaman River. The existing bridge at Hwy 919 Martineau River will be replaced with the salvaged truss bridge from Hwy 905 over Wathaman River. Bidders shall submit all inquiries pertaining to the Bid Package documents a minimum of 3 business days prior to close of bidding directed to: Ministry of SaskBuilds and Procurement [email protected] Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing [email protected] within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities. Estimated Quantities: Supply, Fabrication & Delivery Of Atmospheric Corrosion Resistant Weldable Structural Steel: 1 lump sum Supply And Install Metal Beam Approach Guardrail: 80 m Installation Of Piling: 154 m Granular Backfill At Bridges: 2 600 m3 Completion Date: March 15, 2028 Deposit with each Tender - 5% of total bid. Deputy Minister of Highways

Description

CONSTRUCTION OF SHORT SPAN BRIDGE on Highway No. 905 over Wathaman River approximately 103 km north of junction with Highway No. 102, and on Highway No. 919 over Martineau River approximately 53.3 km north of Pierceland, Saskatchewan. The existing bridge will be dismantled, and a new bridge will be constructed on Highway No. 905 over Wathaman River. The existing bridge at Hwy 919 Martineau River will be replaced with the salvaged truss bridge from Hwy 905 over Wathaman River. Bidders shall submi...

Dates

Publication
8 octobre 2026 à 12 h 15
Date de clôture
3 novembre 2026 à 09 h 00

Documents

Classification

Catégorie normalisée

Construction & Infrastructure

Source: SaskTenders

Dernière modification : 2026-11-25 04 h 17 min 13 s

Actualisation toutes les 2 heures