Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Supply and Delivery of a Forklift (Transit)
The City of Winnipeg · Winnipeg, Manitoba, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 0000329468
- Organisme émetteur
- The City of Winnipeg · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Other
- Titre
- Supply and Delivery of a Forklift (Transit)
- Source
- MERX Manitoba
- Identifiant de la source
- 0000329468
Détails
- Lieu
- Winnipeg, Manitoba, Canada
Résumé
Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of Supply and Delivery of a Forklift (Transit) in accordance with Detailed Specification 26020. D2.2 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work. D2.3 Any material, labour or components not specifically mentioned or included herein, but may be required to complete, perfect and place the equipment in successful operation, shall be furnished by the Contractor as though specifically mentioned in these Contract Documents. The Contractor shall supply the equipment and all components and all features that are normally considered to be standard on that equipment, unless specifically excluded in the Form N: Detailed Specifications. D2.4 Unless specifically stated otherwise in the Form N: Detailed Specifications, only new, unused equipment of current manufacture shall be accepted. D2.5 Further to C7, if at any time during the 12 (twelve) month period following the award of the Contract, the City requires additional quantities of the Items, the City may request the Contractor to supply up to one hundred percent (100%) additional quantities as extra Work at the unit prices set out in the Contract. The Contractor may decline to supply the additional quantities without penalty. See more
Description
Description D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of Supply and Delivery of a Forklift (Transit) in accordance with Detailed Specification 26020. D2.2 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Ad...
Dates
- Publication
- 9 août 2026 à 20 h 00
- Date de clôture
- 3 septembre 2026 à 20 h 00
Comment soumissionner
Classification
Catégorie normalisée
Source: MERX Manitoba
Dernière modification : 2026-09-09 20 h 59 min 00 s
Actualisation toutes les 2 heures