Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AB-2026-01612 (935693)

935693 - 34 St B057 Culvert Replacement - 2675

City of Edmonton · Edmonton, Alberta, Canada

Cet appel d’offres a fermé le 23 mars 2026 à 12 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureMunicipal

Renseignements généraux

Numéro de référence
AB-2026-01612 (935693)
Palier de gouvernement
Municipal
Type d’appel d’offres
Construction & Infrastructure
Titre
935693 - 34 St B057 Culvert Replacement - 2675
Identifiant de la source
AB-2026-01612

Détails

Lieu
Edmonton, Alberta, Canada

Résumé

This Work includes the supply of all labour, materials, equipment and services required to complete the replacement of B057 (Fulton Creek). The Work includes, but is not limited to the following: Mobilization and Demobilization Road Closure Traffic Accommodation Environmental Construction Operation (ECO) Plan Demolition and Disposal of Bridge Structure Excavation - Structural Supply, Assembly and Installation of 22m of Precast Box Culvert (2,440 mm x 1,220 mm) Backfill - Crushed Granular Backfill - Non-Granular Heavy Rock Riprap (Class 1) Pavement and Concrete Removal - Asphalt Course Supply Gravel to Jobsite - Gravel 3-20 Base Non-Woven Geotextile Filter Fabric (Type A) Asphalt Surface - 50 mm Thick (10 mm-HT, PG 58-28) Asphalt Base - 250 mm Thick (20 mm-B, PG 58-28) Guardrail - Supply, Fabrication, Delivery and Installation Miscellaneous Iron Erosion Control Barrier (Straw Fibre Roll) Erosion Control Soil Covering - Supply and Install (Type B) Seeding Total Suspended Solids (TSS) Testing - Deletable Fish Capture and Release - Deletable Commodity: Reinforced concrete built up culvert block, Bridge construction and repair service

Description

This Work includes the supply of all labour, materials, equipment and services required to complete the replacement of B057 (Fulton Creek). The Work includes, but is not limited to the following: Mobilization and Demobilization Road Closure Traffic Accommodation Environmental Construction Operation (ECO) Plan Demolition and Disposal of Bridge Structure Excavation - Structural Supply, Assembly and Installation of 22m of Precast Box Culvert (2,440 mm x 1,220 mm) Backfill - Crushed Granular Backfi...

Dates

Publication
25 février 2026 à 02 h 21
Date de clôture
23 mars 2026 à 12 h 00

Comment soumissionner

Classification

Catégories NIBS

3013151472141107

Catégorie normalisée

Construction & Infrastructure

Source: Alberta Purchasing

Dernière modification : 2026-05-25 14 h 38 min 42 s

Actualisation toutes les 2 heures