Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Bold Center Road Network Infrastructure Installation (Phase 1 and Phase 2)
Lac La Biche County · Alberta, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- AB-2026-03654 (TR-32-2024-01)
- Organisme émetteur
- Lac La Biche County · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Bold Center Road Network Infrastructure Installation (Phase 1 and Phase 2)
- Source
- Alberta Purchasing
- Identifiant de la source
- AB-2026-03654
Détails
- Lieu
- Alberta, Canada
Résumé
SUMMARY OF WORK: The major items of work include the following approximate quantities: 1. General requirements including mobilization, de-mobilization and survey layout etc. 2. Remove and dispose 34m of existing 200mm dia. Storm Sewer 3. Remove and dispose of 5 v.m of existing 2 Manholes including Frame and Covers 4. Remove and dispose of 1 existing Curb & Gutters 5. Remove and dispose of 3,928m3 existing Asphalt (100mm-120mm depth) 6. Remove and dispose of / re-use 7,858m3 existing GBC (up to 300mm depth; subject to site condition and deletion) 7. Remove and dispose of 2,046m existing Curb & Gutters 8. Remove and dispose of 460m3 of existing Concrete (150mm -200mm depth; subject to site condition and deletion) 9. Remove and dispose of / submit existing 1 Fire Hydrant 10. Relocate (un-install and re-install complete) existing 17 Light Poles (single/double head) 11. 18,486m3 topsoil and organic material stripping, hauling to the designated area (within 1.0km), stockpiling and dispose off (300mm depth; subject to site conditions and deletion; subject to site conditions and deletion) 12. 31,252m3 common excavation including cut, fills, compaction, hauling to the designated area (within 1.0km) and stockpiling (subject to site condition and deletion) 13. 2,928m2 of existing asphalt milling (50mm depth) 14. Supply & install 60m, 3m wide trapezoidal day light channel including Class-1 riprap, geotextile complete; subject to site condition and deletion). 15. Supply & install new 1,230m, 300mm dia., PVC DR35 Sanitary Sewer (3m-5m depth) - shored vertical trench 16. Supply & install 7 new, 25.2 v.m of sulfate resistance 1,200mm diameter Manholes 17. Supply & install 7 new NF-80 (floating) Manhole’s Frame & Cover c/w Final Grade Adjustment 18. Tie-in 3 connections, 300mm dia. new Sanitary Sewer to existing Manholes 19. Tie-in 7 connections, 300mm dia. new Sanitary Sewer to existing Manholes including internal drop structure complete 20. Maintain (uninterrupted) sanitary services to all the residents throughout construction and bypass pumping of all sanitary flows including inflow and infiltration and back up pump from start till completion of project 21. Supply & install 31,746m3 clay complete including common excavation, cuts, fills, compaction, hauling and stockpiling (subject to site condition and deletion) 22. Over excavation and disposal of approximately 910m3 of unsuitable material (subject to site condition and deletion) 23. Over excavation and placement of 910m3 of Washed Rock (subject to site condition and deletion) 24. Approximately 300m of Special Foundation (1m wide, 150mm depth concrete subject to site condition and deletion) 25. Supply & install new 1,438m of Ultra Rib Storm Sewer 525mm dia. (3m-5m depth) – shored vertical trench 26. Supply & install new 332m of PVC Ultra X2, 750mm dia. (3m-5m depth) – shored vertical trench 27. Supply & install new 402m of PVC Ultra X2, 900mm dia. (3m-5m depth) – shored vertical trench 28. Supply & install 17 new, 51 v.m of sulfate resistance 1,200mm diameter Manholes 29. Supply & install 11 new, 54.2 v.m of sulfate resistance 1,500mm diameter Manholes 30. Supply & install 28 new NF-80 (floating) Manhole’s Frame & Cover c/w Final Grade Adjustment 31. Tie-in 4 connections of 525mm dia. new Storm Sewer to existing Manholes 32. Supply & install 2 new, 6.5 v.m of sulfate resistance 1,200mm diameter CB Manholes 33. Supply & install 64 new 610 CB with 250mm dia. leads complete 34. Supply & install 60m new 900mm dia., PVC Ultra X2 with steel casing pipe 1,200mm dia., 12.7mm thick stainless steel casing, spacer BWM-R or equivalent as per manufacturer specifications (3m - 5m depth; installed by cased boring/augering; subject to site condition and deletion) 35. Maintain (uninterrupted) stormwater / drainage throughout construction and bypass pumping of all stormwater / drainage flows and back up pump from start till completion of project 36. Supply & install new 82m of C-900, PVC DR18 Watermain 150mm dia. (3m depth) – shored vertical trench 37. Supply & install new 664m of C-900, PVC DR18 Watermain 300mm dia. (3m depth) – shored vertical trench 38. Supply and install 7 new, 300mm Gate Valve c/w Valve Box complete 39. Supply and install 4 new, 150mm Gate Valve c/w Valve Box complete 40. Supply and install 9 new Fire Hydrant, Valve and Lead complete 41. Tie-in 4 service connections, 150mm dia. to existing 300mm dia. Watermain complete 42. Tie-in 2 connections, 300mm dia. new Watermain to existing and new 300mm Watermains complete 43. Supply and install 9, 50mm dia. new Flush Point with plug complete 44. Maintain (uninterrupted) water supply to all the residents throughout construction 45. Supply and install 101,790m2 new Sub-Grade Preparation (150mm depth; subject to site condition and deletion) 46. Reuse and install 7,858m3 existing road’s Gravel Base Course (GBC; 300mm depth; subject to site condition and deletion) 47. Supply and install 25,324m3 new Gravel Base Course (GBC; 300m
Description
SUMMARY OF WORK: The major items of work include the following approximate quantities: 1. General requirements including mobilization, de-mobilization and survey layout etc. 2. Remove and dispose 34m of existing 200mm dia. Storm Sewer 3. Remove and dispose of 5 v.m of existing 2 Manholes including Frame and Covers 4. Remove and dispose of 1 existing Curb & Gutters 5. Remove and dispose of 3,928m3 existing Asphalt (100mm-120mm depth) 6. Remove and dispose of / re-use 7,858m3 existing GBC (up to 3...
Dates
- Publication
- 8 mai 2026 à 09 h 59
- Date de clôture
- 29 mai 2026 à 10 h 00
Comment soumissionner
Classification
Catégories NIBS
Catégorie normalisée
Source: Alberta Purchasing
Dernière modification : 2026-09-09 20 h 59 min 18 s
Actualisation toutes les 2 heures