Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AB-2026-04029 (27PAR8037)

Wildfire Recovery Fencing and Gates - Redwater Provincial Recreation Area

Forestry and Parks · Alberta, Canada

Cet appel d’offres a fermé le 23 juin 2026 à 10 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
AB-2026-04029 (27PAR8037)
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
Wildfire Recovery Fencing and Gates - Redwater Provincial Recreation Area
Identifiant de la source
AB-2026-04029

Détails

Lieu
Alberta, Canada

Résumé

PROJECT BACKGROUND: Redwater Provincial Recreation Area (PRA) experienced a major human caused wildfire in May of 2025, burning more than 3,200 hectares, largely within the park boundary. This resulted in the ongoing closure to the public while recovery and assessment activities continue. The fire highlighted the need for improved management tools to support seasonal closures, particularly during periods of elevated wildfire risk when off highway vehicle (OHV) bans may be required. PROJECT OBJECTIVE: This project aims to establish access control at the PRA through the construction of fencing along key boundary areas and the installation of gates at designated trail access points. The work will also reduce ongoing maintenance requirements by replacing wildfire-damaged infrastructure. • All work shall be in accordance with all local and provincial codes and regulations. All work shall be performed by a qualified tradesman, tested and under warranty for a period of one year from acceptance date of work. • The contractor shall provide all labour, materials, tools, equipment, and services including transportation necessary to complete the Work. The intent is that the Contractor provides a complete job. Demolition and disposal costs are to be included in the Contractor’s quote. The site is to be clear of all debris upon completion of demolition work. • The Contractor shall be responsible for all damages to the site as a result of this work, activities of this work, and activities of his workmen or negligent security arrangements. Damages shall be repaired at Contractor’s own expense. • All products shall be as-specified or a prior-approved equal before contractor commences work. The costs of any changes affecting other disciplines, including approved alternatives, shall be included in the contract cost. Shop drawings are to be submitted for approval prior to construction work occurring. Commodity: Building and Facility Construction and Maintenance Services

Description

PROJECT BACKGROUND: Redwater Provincial Recreation Area (PRA) experienced a major human caused wildfire in May of 2025, burning more than 3,200 hectares, largely within the park boundary. This resulted in the ongoing closure to the public while recovery and assessment activities continue. The fire highlighted the need for improved management tools to support seasonal closures, particularly during periods of elevated wildfire risk when off highway vehicle (OHV) bans may be required. PROJECT OBJE...

Dates

Publication
28 mai 2026 à 04 h 00
Date de clôture
23 juin 2026 à 10 h 00

Comment soumissionner

Classification

Catégories NIBS

72000000

Catégorie normalisée

Construction & Infrastructure

Source: Alberta Purchasing

Dernière modification : 2026-09-09 20 h 59 min 26 s

Actualisation toutes les 2 heures