Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
C4N117106794

Tunnel Segment Production Monitoring System

Sizewell C Limited · Royaume-Uni

Cet appel d’offres a fermé le 14 août 2026 à 12 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureFédéral

Renseignements généraux

Numéro de référence
C4N117106794
Palier de gouvernement
Federal
Type d’appel d’offres
Construction & Infrastructure
Titre
Tunnel Segment Production Monitoring System
Identifiant de la source
2375427c-6174-48ea-9bb1-6dca14761f9f-909713

Détails

Lieu
Royaume-Uni

Résumé

This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from the moment a segment is cast until it is installed within the tunnel structure. Currently, critical gaps exist in reporting, quality traceability, inventory discrepancies, and segment tracking across the supply chain. A comprehensive traceability system is essential to manage the entire lifecycle, prevent installation errors, ensure quality compliance, eliminate segment duplication, and maintain supply chain transparency across all stakeholders.

Description

This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facilities (TPF, Railhead, ACA and TLC), ultimately installed within three TBMs serving two intake tunnels and one outfall tunnel configuration. This operation requires complete end-to-end visibility from ...

Dates

Publication
6 août 2026 à 08 h 50
Date de clôture
14 août 2026 à 12 h 00

Valeur estimée

$500K GBP

Comment soumissionner

Classification

Catégorie normalisée

Construction & Infrastructure

Source: Contracts Finder (UK)

Dernière modification : 2026-09-09 21 h 00 min 09 s

Actualisation toutes les 2 heures