Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Queens Drive Highway Improvement Works
Liverpool City Council · Royaume-Uni
Temps restant pour soumissionner
Attribué
Renseignements généraux
- Numéro de référence
- LPOOL001-DN783452-01444922
- Organisme émetteur
- Liverpool City Council · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Queens Drive Highway Improvement Works
- Source
- Contracts Finder (UK)
- Identifiant de la source
- fcfde891-c04b-48e4-807b-9c9973de3775-886679
Détails
- Lieu
- Royaume-Uni
Résumé
Liverpool City Council is seeking a supplier to complete highway improvement works on Queens Drive. The scope includes: • Carriageway resurfacing between its junction with Dovedale Road and Mossley Hill Drive • Upgrade of existing footways and paved areas • Upgrade of existing highway drainage network • Accessibility improvements, such as upgrade of existing pedestrian crossing facilities In addition, the project will include implementation of interventions associated with the S278 Liverpool College (off-site) highway works, including: • Carriageway resurfacing along North Mossley Hill Road • Verge protection and repair measures along Queens Drive and Aigburth Vale • Improvements to Ibbotson's Lane Public Right of Way • Traffic signal upgrades at the junction of Queens Drive / North Mossley Hill Road • Installation of a new cyclist and pedestrian crossing facility at the junction of Ibbotson's Lane and North Mossley Hill to facilitate active travel • TRO changes along Queens Drive and North Mossley Hill Road The opportunity will be competed under Lot 2 of LCC's Highway Planned Works Framework.
Description
Liverpool City Council is seeking a supplier to complete highway improvement works on Queens Drive. The scope includes: • Carriageway resurfacing between its junction with Dovedale Road and Mossley Hill Drive • Upgrade of existing footways and paved areas • Upgrade of existing highway drainage network • Accessibility improvements, such as upgrade of existing pedestrian crossing facilities In addition, the project will include implementation of interventions associated with the S278 Liverpool ...
Dates
- Publication
- 2 mars 2026 à 09 h 45
- Date de clôture
- 3 septembre 2025 à 07 h 00
Valeur estimée
$1.9M GBP
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-09-02 11 h 53 min 56 s
Actualisation toutes les 2 heures