RIP-RAP PLACEMENT AT VARIOUS BRIDGE & CULVERT SITES SOUTH OF DUCK MOUNTAIN

Manitoba Transportation and Infrastructure - Tendering and Contracts · Southwest, Manitoba, Canada

Cet appel d’offres a fermé le 1 octobre 2026 à 20 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméConstruction et infrastructureProvincial

Renseignements généraux

Numéro de référence
0000332148
Palier de gouvernement
Provincial
Type d’appel d’offres
Construction & Infrastructure
Titre
RIP-RAP PLACEMENT AT VARIOUS BRIDGE & CULVERT SITES SOUTH OF DUCK MOUNTAIN
Identifiant de la source
0000332148

Détails

Lieu
Southwest, Manitoba, Canada

Résumé

Description SECTION I Rip-Rap placement at the existing reinforced concrete box culvert on PTH 10 over Pine Creek located in the RM of Mountain, approximately 1.9 km south of PR 271, Bridge Site No.: 1513-00 SECTION II Rip-Rap placement on the existing bridge over Birdtail Creek, Tributary on PR 254, located in the RM of Rossburn, approximately 7.3 km east of PR 476, Bridge Site No.: 4345-10 SECTION III Rip-Rap placement on the existing bridge over Wilson River on PTH 10, located in the RM of Gilbert Plains, approximately 1.5km north of PTH 5, Bridge Site No.: 435-00 SECTION IV Rip-Rap placement on the existing bridge over Valley River on PR 274, located in the RM of Gilbert Plains, approximately 1.9 km north of PTH 5, Bridge Site No.: 2972-00 SECTION V Rip-Rap placement on the reinforced concrete box culvert over Gilbert Creek on PTH 5, located in the RM of Grandview, approximately 21 km west of PR 366, Bridge Site No.: 2516-10 See more

Description

Description SECTION I Rip-Rap placement at the existing reinforced concrete box culvert on PTH 10 over Pine Creek located in the RM of Mountain, approximately 1.9 km south of PR 271, Bridge Site No.: 1513-00 SECTION II Rip-Rap placement on the existing bridge over Birdtail Creek, Tributary on PR 254, located in the RM of Rossburn, approximately 7.3 km east of PR 476, Bridge Site No.: 4345-10 SECTION III Rip-Rap placement on the existing bridge over Wilson River on PTH 10, located in the RM of Gi...

Dates

Publication
17 septembre 2026 à 20 h 00
Date de clôture
1 octobre 2026 à 20 h 00

Classification

Catégorie normalisée

Construction & Infrastructure

Source: MERX Manitoba

Dernière modification : 2026-11-25 04 h 19 min 13 s

Actualisation toutes les 2 heures