Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AB-2026-06603 (COSG-Engineering-2026-020)

Feasibility Study for Zone 1 New Water Reservoir

City of Spruce Grove · Alberta, Canada

Cet appel d’offres a fermé le 22 octobre 2026 à 12 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméServices professionnels et de consultationMunicipal

Renseignements généraux

Numéro de référence
AB-2026-06603 (COSG-Engineering-2026-020)
Palier de gouvernement
Municipal
Type d’appel d’offres
Professional & Consulting Services
Titre
Feasibility Study for Zone 1 New Water Reservoir
Identifiant de la source
AB-2026-06603

Détails

Lieu
Alberta, Canada

Résumé

The City of Spruce Grove receives potable water from the Capital Region Parkland Water Services Commission (CRPWSC) water supply system, sourced by EPCOR, and stores it primarily in the Zone 1 reservoir (also known as the south reservoir) within pressure zone 1. The south reservoir in Zone 1 had three storage cells until recently, when Cell 1-1 was decommissioned this year. As a result, the reservoir's total capacity has decreased from 43,000 m3 to approximately 34,000 m3. In addition, Cell 1-2 is approaching the end of its life and currently provides a considerable amount of water storage (~14,000 m3) for the City. The north reservoir in Zone 2 provides approximately 6,819 m3 of water storage, which is fed by the Zone 1 reservoir through a 600 mm distribution main connection. The reservoir component is also approaching its design life and is expected to be decommissioned soon. Given these current and future storage reductions, the City intends to increase the Zone 1 reservoir capacity to accommodate future demand under the built-out scenario. Accordingly, the City requires an assessment of future storage requirements and an associated conceptual sizing and location study. Commodity: Professional engineering services, Civil engineering

Description

The City of Spruce Grove receives potable water from the Capital Region Parkland Water Services Commission (CRPWSC) water supply system, sourced by EPCOR, and stores it primarily in the Zone 1 reservoir (also known as the south reservoir) within pressure zone 1. The south reservoir in Zone 1 had three storage cells until recently, when Cell 1-1 was decommissioned this year. As a result, the reservoir's total capacity has decreased from 43,000 m3 to approximately 34,000 m3. In addition, Cell 1-2 ...

Dates

Publication
29 septembre 2026 à 11 h 22
Date de clôture
22 octobre 2026 à 12 h 00

Comment soumissionner

Classification

Catégories NIBS

8110000081101500

Catégorie normalisée

Professional & Consulting Services

Source: Alberta Purchasing

Dernière modification : 2026-11-25 04 h 18 min 14 s

Actualisation toutes les 2 heures