Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.
Temporary Works Designer - Framework
Ferrovial BAM Rail Systems · Royaume-Uni
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- C4N111835379
- Organisme émetteur
- Ferrovial BAM Rail Systems · Voir l'historique des attributions →
- Palier de gouvernement
- Federal
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- Temporary Works Designer - Framework
- Source
- Contracts Finder (UK)
- Identifiant de la source
- 38570d6c-6d21-45f0-ac5f-d2ca25177616-895688
Détails
- Lieu
- Royaume-Uni
Résumé
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Description
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this sta...
Dates
- Publication
- 1 mai 2026 à 04 h 10
- Date de clôture
- 15 mai 2026 à 11 h 30
Valeur estimée
$1.0M GBP
Comment soumissionner
Classification
Catégorie normalisée
Source: Contracts Finder (UK)
Dernière modification : 2026-09-09 21 h 03 min 00 s
Actualisation toutes les 2 heures