PCS25020 - Buffalo Pound Provincial Park Watermain Replacement
SaskBuilds and Procurement · Saskatchewan, Canada
Temps restant pour soumissionner
Fermé
Renseignements généraux
- Numéro de référence
- 346-2026
- Organisme émetteur
- SaskBuilds and Procurement · Voir l'historique des attributions →
- Palier de gouvernement
- Provincial
- Type d’appel d’offres
- Construction & Infrastructure
- Titre
- PCS25020 - Buffalo Pound Provincial Park Watermain Replacement
- Source
- SaskTenders
- Identifiant de la source
- 290843f0-ae01-48e8-9d92-bbfebc97899e
Détails
- Lieu
- Saskatchewan, Canada
Résumé
PCS25020 - Buffalo Pound Provincial Park Watermain ReplacementProject Scope:The Work consists of the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main by Horizontal Directional Drilling (HDD) to replace the existing asbestos cement (AC) water main. The Work includes all associated appurtenances, including isolation valves, air release and combination air valve (CAV) chambers, pressure reducing valve (PRV) chambers, drains, fittings, joint restraints, and water service connections. The Work also includes all required site preparation activities, including clearing, grubbing, stripping, and stockpiling of materials; drilling, excavation, shoring, backfilling, and restoration; control of surface water and groundwater, including dewatering and disposal of water encountered during excavation, HDD installation, and testing; utility locating and daylighting as required; and connection to the existing water distribution system at the Buffalo Pound Water Treatment Plant, including coordination of planned shutdowns and completion of all tie-in connections. In addition, the Work includes hydrostatic pressure and leakage testing, disinfection, flushing, commissioning of the new water main, and testing of all materials incorporated into the Work. The Contractor shall also complete all site cleanup and restoration upon completion of construction and correct any deficiencies identified during the warranty period. All work is to completed by March 24, 2027. Participation Process:Competition documents for this procurement are available through the Government of Saskatchewan’s Government Enterprise Management (GEM) system. All amendments, addenda, clarifications, and further instructions will be posted on GEM. To participate, suppliers must be registered in GEM’s electronic bidding platform. Registration is mandatory to download competition documents, submit questions, receive updates (e.g., amendments, addenda, clarifications) and submit a bid. How to Participate:Click the link:Negotiation Abstracts PageEnter the competition number, title, or type into the search bar to locate the opportunityClick on the competitionSelect the Sign In button to log into GEMNew to GEM? Suppliers who are not yet registered must complete the Self-Registration process by clicking the Register button on the Negotiation Abstracts Page within GEM, or via the linkSupplier Registration. To learn more about GEM and the Supplier Portal, please visitProcurement in GEM. For support or inquiries, contact[email protected]
Description
PCS25020 - Buffalo Pound Provincial Park Watermain ReplacementProject Scope:The Work consists of the supply and installation of approximately 7.5 km of 200 mm diameter DR11 HDPE potable water main by Horizontal Directional Drilling (HDD) to replace the existing asbestos cement (AC) water main. The Work includes all associated appurtenances, including isolation valves, air release and combination air valve (CAV) chambers, pressure reducing valve (PRV) chambers, drains, fittings, joint restraints,...
Dates
- Publication
- 28 juillet 2026 à 04 h 30
- Date de clôture
- 18 août 2026 à 10 h 00