Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
2908-RFQ-FW-DA

Electric Vehicle Leasing and Vehicle Salary Sacrifice Scheme for Great Yarmouth Borough Council

Suffolk Coastal District Council and Waveney District Council · Royaume-Uni

Ce contrat a été attribué. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Attribué

AttribuéGestion des installationsFédéral

Renseignements généraux

Numéro de référence
2908-RFQ-FW-DA
Palier de gouvernement
Federal
Type d’appel d’offres
Facilities Management
Titre
Electric Vehicle Leasing and Vehicle Salary Sacrifice Scheme for Great Yarmouth Borough Council
Identifiant de la source
d7561127-59f5-4fbc-b0e5-013f9c7098c3-921687

Détails

Lieu
Royaume-Uni

Résumé

This is a Contract Award Notice. This is a Direct Award Call Off Contract via CPC Drive: Vehicle Leasing and Salary Sacrifice Scheme Framework (NOE.0524)/ NOE CPC Reference: C44004 It should be noted that there will be no direct cost to the Council as this is a leasing scheme based on salary sacrifice scheme for GYBC employees. Total Cost of Call Off is unknown as based on the uptake of the scheme by GYBC employees as well as the respective duration of the leasing. Additional information: This is a Contract Award Notice. This is a Direct Award Call Off Contract via CPC Drive: Vehicle Leasing and Salary Sacrifice Scheme Framework (NOE.0524)/ NOE CPC Reference: C44004 It should be noted that there will be no direct cost to the Council as this is a leasing scheme based on salary sacrifice scheme for GYBC employees. Total Cost of Call Off is unknown as based on the uptake of the scheme by GYBC employees as well as the respective duration of the leasing.

Description

This is a Contract Award Notice. This is a Direct Award Call Off Contract via CPC Drive: Vehicle Leasing and Salary Sacrifice Scheme Framework (NOE.0524)/ NOE CPC Reference: C44004 It should be noted that there will be no direct cost to the Council as this is a leasing scheme based on salary sacrifice scheme for GYBC employees. Total Cost of Call Off is unknown as based on the uptake of the scheme by GYBC employees as well as the respective duration of the leasing. Additional information: Thi...

Dates

Publication
16 novembre 2026 à 16 h 02
Date de clôture
4 octobre 2026 à 10 h 00

Valeur estimée

$1 GBP

Classification

Catégorie normalisée

Facilities Management

Source: Contracts Finder (UK)

Dernière modification : 2026-11-18 17 h 08 min 52 s

Actualisation toutes les 2 heures