Langue de l’avis : Anglais · Aucun résumé vérifié en Français n’est disponible. Le texte enregistré est affiché; consultez les documents d’origine.

Tous les appels d’offres
AL-AKUK-CS-QCBS-2.1.2-1

Feasibility Study/Preliminary Design, detailed design, assistance in tendering phase, bidding documents, and technical supervision of works for Gjirokaster.

Agency for Water Supply, Sanitation and Waste · International

Cet appel d’offres a fermé le 19 janvier 2026 à 19 h 00. Consulter les avis ouverts
Consulter la source

Temps restant pour soumissionner

Fermé

FerméServices professionnels et de consultationinternational

Renseignements généraux

Numéro de référence
AL-AKUK-CS-QCBS-2.1.2-1
Palier de gouvernement
international
Type d’appel d’offres
Professional & Consulting Services
Titre
Feasibility Study/Preliminary Design, detailed design, assistance in tendering phase, bidding documents, and technical supervision of works for Gjirokaster.
Identifiant de la source
OP00415530

Détails

Lieu
International

Résumé

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – CONSULTANCY FIRM) ALBANIA Project: Clean and Resilient Environment for Blue Sea (Care4Blue) Loan No.: IBRD 95070 Assignment Title: Feasibility study, Preliminary Design, Detailed Design, Assistance in Tendering and Supervision of Works for Gjirokastra Wastewater Management Interventions. Reference No.: AL-AKUK-CS-QCBS-2.1.2-1 The Government of Albania has identified the south of Albania as a priority for regional development. The priority status comes from its unique natural resources and cultural heritage assets and its potential to further develop tourism as a driver of local, regional, and national economic growth. The Ionian coastline and the southern hinterland offer an appealing tourism value proposition in terms of pristine coastlines, rivers, mountains, protected areas, and cultural heritage. However, for the tourism product to remain attractive in terms of offering ‘blue seas’ and ‘clean rivers’, there are challenges in maintaining the health of coastal and river ecosystems critical to sustaining the quality of the region’s assets. To maintain the quality of the Vjosa River and thus its value as tourist attraction, and status as a protected area, water pollution needs to be managed, particularly from wastewater and non-point sources. Technical solutions will consider the full sanitation service chain, i.e., household containment, collection, conveyance, treatment, and safe disposal. The programme will use the Citywide Inclusive Sanitation (CWIS) approach. This Request for Expressions of Interest aims to hire a Consultant that will provide comprehensive technical assistance to PCU/AKUK and the Municipality of Gjirokastra to ensure successful preparation and implementation of wastewater investments. Specifically, the Consultant will: Prepare a Feasibility Study assessing the technical, financial, and institutional aspects of the proposed wastewater management interventions 1(i), 1(ii) and 1(iii) described in Section 3 of the ToRs, and prepare a Conceptual Design Report presenting the recommended configuration of these complementary systems. Develop Preliminary Engineering Designs and the associated technical documentation of all elements of the identified wastewater management interventions, i.e. the sewerage networks, the pumping stations, the WWTP(s), and the on-site sanitation systems. Develop Detailed Engineering Designs and the associated technical and tender documentation for all interventions identified under 1(i), 1(ii) and 1(iii), except for the WWTP(s), following the FIDIC Pink book format. Develop tender documentation for the WWTP(s) following the FIDIC Yellow book format. Support the PCU/AKUK during the procurement and tendering processes, including Early Market Engagement. Provide supervision of the civil works and administration of the associated contracts under FIDIC conditions. The Consultant shall cooperate with the separate Technical Assistance team preparing the Environmental and Social Impact Assessment (ESIA), Environmental and Social Framework (ESF), and related instruments for Gjirokastra. The detailed Terms of Reference (ToR) for the assignment can be found at the following website: https://akuk.gov.al/ The Consultancy Services outlined in Chapter 4 of the ToRs(”Scope of Services”) shall be scheduled tentatively in accordance with the following time schedule: Part I (Phase 1, 2 and 3): The Feasibility Reports (Draft) shall be submitted 4 months after commencement of the services. The Detailed Design and Tender Documents shall be submitted 10 months after commencement of the services. The tendering and the award of the contracts shall occur by 16 months after commencement of the services. Part II (Supervision and DNP - Phase 4): Completion of works 34 months after commencement of the consultancy services. The services during the DNP shall cover a period of 12 months for regular works and an extended period of 24 months for the WWTP(s). In addition, assistance during initial operation of the WWTP(s) shall cover a period of 12 months, concurrent with the first 12 months of the DNP. End of DNP for regular works/ operation assistance after 46 months. End of DNP for plants after up to 58 months. The assignment requires a firm which can demonstrate a minimum of 15 years of proven experience in Design and Supervision of water supply and sanitation projects. Successful completion of at least 2 feasibility/design assignments and 2 supervision assignments of similar, or larger, size (for a works contract of ≥10 million EUR) in the sanitation sector in the last 15 years, preferably financed by IFIs (World Bank, AFD, EIB, EU, etc.); Experience in the region, which includes Albania, Kosovo, North Macedonia, Montenegro, Serbia, Greece, is an advantage The tenderer shall submit CVs and statements of availability for the following key experts: Team Leader International Sanitation Expert Internati

Description

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – CONSULTANCY FIRM) ALBANIA Project: Clean and Resilient Environment for Blue Sea (Care4Blue) Loan No.: IBRD 95070 Assignment Title: Feasibility study, Preliminary Design, Detailed Design, Assistance in Tendering and Supervision of Works for Gjirokastra Wastewater Management Interventions. Reference No.: AL-AKUK-CS-QCBS-2.1.2-1 The Government of Albania has identified the south of Albania as a priority for regional development. The ...

Dates

Publication
16 décembre 2025 à 19 h 00
Date de clôture
19 janvier 2026 à 19 h 00

Classification

Catégorie normalisée

Professional & Consulting Services

Source: World Bank

Dernière modification : 2026-09-02 12 h 03 min 28 s

Actualisation toutes les 2 heures